Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Corvallis is soliciting sealed bids for construction of the Wastewater Reclamation Plant Secondary Process Improvements, Phase 2. This project includes the installation of RAS and WAS pumps, piping, precast utility vaults, paving, and electrical/instrumentation work, along with the construction of walls and building features at the WAS station. The scope involves installing pre-purchased RAS pumps and performing associated civil, mechanical, and electrical improvements as per contract requirements. Bidders must submit sealed bids according to the City's instructions on the buyer site.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Corvallis is soliciting sealed bids for construction of the Wastewater Reclamation Plant Secondary Process Improvements, Phase 2. This project includes the installation of RAS and WAS pumps, piping, precast utility vaults, paving, and electrical/instrumentation work, along with the construction of walls and building features at the WAS station. The scope involves installing pre-purchased RAS pumps and performing associated civil, mechanical, and electrical improvements as per contract requirements. Bidders must submit sealed bids according to the City's instructions on the buyer site.
Posted Date
Dec 10, 2025
Due Date
Jan 22, 2026
Release: Dec 10, 2025
Close: Jan 22, 2026
The City of Corvallis is soliciting sealed bids for construction of the Wastewater Reclamation Plant Secondary Process Improvements, Phase 2. This project includes the installation of RAS and WAS pumps, piping, precast utility vaults, paving, and electrical/instrumentation work, along with the construction of walls and building features at the WAS station. The scope involves installing pre-purchased RAS pumps and performing associated civil, mechanical, and electrical improvements as per contract requirements. Bidders must submit sealed bids according to the City's instructions on the buyer site.
AvailableWork includes wastewater treatment plant improvements, fine screens, process instrumentation, process mixers, fine bubble diffusers, aeration piping and equipment, process blowers, process pumps, membrane system.
Posted Date
Nov 28, 2025
Due Date
Dec 22, 2025
Release: Nov 28, 2025
Close: Dec 22, 2025
Work includes wastewater treatment plant improvements, fine screens, process instrumentation, process mixers, fine bubble diffusers, aeration piping and equipment, process blowers, process pumps, membrane system.
Rehabilitation of the secondary clarifiers at the wastewater treatment plant. The project includes structural, process, and electrical rehabilitation of the lower plant secondary clarifiers no. 27 and no. 37 to improve operational reliability and performance.
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
Rehabilitation of the secondary clarifiers at the wastewater treatment plant. The project includes structural, process, and electrical rehabilitation of the lower plant secondary clarifiers no. 27 and no. 37 to improve operational reliability and performance.
AvailableWork includes comprehensive improvements to the lift station, the wastewater treatment plant (wwtp), and the sanitary sewer system. At the lift station, work will involve installing a new level transducer with associated electrical and controls, replacing the control panel, and adding a permanent natural gas generator with an automatic transfer switch. Additional upgrades include the installation of bollards, a new submersible pump, a precast concrete top on the wet well with a new access hatch and fall protection, and a davit crane for safe equipment handling. At the wwtp, the scope includes removing existing chlorine disinfection equipment, making minor structural modifications, and installing a new ultraviolet disinfection system.
Posted Date
Dec 4, 2025
Due Date
Jan 7, 2026
Release: Dec 4, 2025
Close: Jan 7, 2026
Work includes comprehensive improvements to the lift station, the wastewater treatment plant (wwtp), and the sanitary sewer system. At the lift station, work will involve installing a new level transducer with associated electrical and controls, replacing the control panel, and adding a permanent natural gas generator with an automatic transfer switch. Additional upgrades include the installation of bollards, a new submersible pump, a precast concrete top on the wet well with a new access hatch and fall protection, and a davit crane for safe equipment handling. At the wwtp, the scope includes removing existing chlorine disinfection equipment, making minor structural modifications, and installing a new ultraviolet disinfection system.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.