Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes comprehensive improvements to the lift station, the wastewater treatment plant (wwtp), and the sanitary sewer system. At the lift station, work will involve installing a new level transducer with associated electrical and controls, replacing the control panel, and adding a permanent natural gas generator with an automatic transfer switch. Additional upgrades include the installation of bollards, a new submersible pump, a precast concrete top on the wet well with a new access hatch and fall protection, and a davit crane for safe equipment handling. At the wwtp, the scope includes removing existing chlorine disinfection equipment, making minor structural modifications, and installing a new ultraviolet disinfection system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide wastewater system improvements that also includes 1 LS erosion control; 1 LS bypass pumping and temporary treatment during wastewater treatment facility improvements; 1 LS site earthwork and final grading. Includes grading for UV, operations building and associated piping; 1 LS gravel pavement. See outside link.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
Provide wastewater system improvements that also includes 1 LS erosion control; 1 LS bypass pumping and temporary treatment during wastewater treatment facility improvements; 1 LS site earthwork and final grading. Includes grading for UV, operations building and associated piping; 1 LS gravel pavement. See outside link.
AvailableThe City of Corvallis is soliciting sealed bids for construction of the Wastewater Reclamation Plant Secondary Process Improvements, Phase 2. This project includes the installation of RAS and WAS pumps, piping, precast utility vaults, paving, and electrical/instrumentation work, along with the construction of walls and building features at the WAS station. The scope involves installing pre-purchased RAS pumps and performing associated civil, mechanical, and electrical improvements as per contract requirements. Bidders must submit sealed bids according to the City's instructions on the buyer site.
Posted Date
Dec 10, 2025
Due Date
Jan 22, 2026
Release: Dec 10, 2025
Close: Jan 22, 2026
The City of Corvallis is soliciting sealed bids for construction of the Wastewater Reclamation Plant Secondary Process Improvements, Phase 2. This project includes the installation of RAS and WAS pumps, piping, precast utility vaults, paving, and electrical/instrumentation work, along with the construction of walls and building features at the WAS station. The scope involves installing pre-purchased RAS pumps and performing associated civil, mechanical, and electrical improvements as per contract requirements. Bidders must submit sealed bids according to the City's instructions on the buyer site.
Project consists of replacing approx 12,000 LF of 8 and 350 LF of 12 pvc gravity sewer mains along with 60 manholes, 110 replacement sewer services and road restoration. There are also upgrades to generators and scada systems at three existing lift stations.
Posted Date
Nov 18, 2025
Due Date
Dec 19, 2025
Release: Nov 18, 2025
Close: Dec 19, 2025
Project consists of replacing approx 12,000 LF of 8 and 350 LF of 12 pvc gravity sewer mains along with 60 manholes, 110 replacement sewer services and road restoration. There are also upgrades to generators and scada systems at three existing lift stations.
AvailableWork includes improvements to the town's existing wastewater treatment plant (wwtp) and collection system, the wwtp work includes but is not limited to conversion of the existing sludge digester to a new sequential batch reactor (sbr) with new diffused aeration equipment, new sbr blowers with vfd's and dissolved oxygen (do) control, backup sbr control system, structural improvements to the existing concrete tanks, conversion of the existing chlorine contact tank to a new uv disinfection tank, new effluent pump station with new force main and outfall structure, the collection system work includes but is not limited to replacing the existing lift station with a new submersible lift station, wet well, valve pit, electrical, controls, cloud-based monitoring system, and replacement of the existing force main.
Posted Date
Dec 10, 2025
Due Date
Feb 17, 2026
Release: Dec 10, 2025
Close: Feb 17, 2026
Work includes improvements to the town's existing wastewater treatment plant (wwtp) and collection system, the wwtp work includes but is not limited to conversion of the existing sludge digester to a new sequential batch reactor (sbr) with new diffused aeration equipment, new sbr blowers with vfd's and dissolved oxygen (do) control, backup sbr control system, structural improvements to the existing concrete tanks, conversion of the existing chlorine contact tank to a new uv disinfection tank, new effluent pump station with new force main and outfall structure, the collection system work includes but is not limited to replacing the existing lift station with a new submersible lift station, wet well, valve pit, electrical, controls, cloud-based monitoring system, and replacement of the existing force main.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.