Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of a new 277/480v/3-phase electrical service and temporary re-feeding the existing 120/240v/3- phase equipment and circuits. Work includes concrete transformer pads and all necessary grading, erosion control, and other associated appurtenances and miscellaneous work items.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes wastewater treatment plant improvements electrical equipment.
Posted Date
Jan 22, 2026
Due Date
Feb 23, 2026
Release: Jan 22, 2026
Close: Feb 23, 2026
Work includes wastewater treatment plant improvements electrical equipment.
AvailableThe project is divided into three separate contracts for the Wastewater Treatment Plant Improvement Project: Contract No. 1A – General Construction; Contract No. 1B – Electrical Construction; and Contract No. 1C - Mechanical Construction.
Posted Date
Dec 17, 2025
Due Date
Jan 29, 2026
Release: Dec 17, 2025
Close: Jan 29, 2026
The project is divided into three separate contracts for the Wastewater Treatment Plant Improvement Project: Contract No. 1A – General Construction; Contract No. 1B – Electrical Construction; and Contract No. 1C - Mechanical Construction.
AvailableWork includes improvements to the town's existing wastewater treatment plant (wwtp) and collection system, the wwtp work includes but is not limited to conversion of the existing sludge digester to a new sequential batch reactor (sbr) with new diffused aeration equipment, new sbr blowers with vfd's and dissolved oxygen (do) control, backup sbr control system, structural improvements to the existing concrete tanks, conversion of the existing chlorine contact tank to a new uv disinfection tank, new effluent pump station with new force main and outfall structure, the collection system work includes but is not limited to replacing the existing lift station with a new submersible lift station, wet well, valve pit, electrical, controls, cloud-based monitoring system, and replacement of the existing force main.
Posted Date
Dec 10, 2025
Due Date
Feb 17, 2026
Release: Dec 10, 2025
Close: Feb 17, 2026
Work includes improvements to the town's existing wastewater treatment plant (wwtp) and collection system, the wwtp work includes but is not limited to conversion of the existing sludge digester to a new sequential batch reactor (sbr) with new diffused aeration equipment, new sbr blowers with vfd's and dissolved oxygen (do) control, backup sbr control system, structural improvements to the existing concrete tanks, conversion of the existing chlorine contact tank to a new uv disinfection tank, new effluent pump station with new force main and outfall structure, the collection system work includes but is not limited to replacing the existing lift station with a new submersible lift station, wet well, valve pit, electrical, controls, cloud-based monitoring system, and replacement of the existing force main.
AvailableProvide wastewater treatment plant improvements.
Posted Date
Jan 21, 2026
Due Date
Feb 11, 2026
Release: Jan 21, 2026
Close: Feb 11, 2026
Provide wastewater treatment plant improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis