Description: Provide wastewater mechanical equipment (clarifier, dissolved air floatation tank (daft), bar screens, diffuser and gear boxes) supplies, inspections, maintenance, repair and replacement services.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
From the first pre-RFP signals to the published RFP and its files.
1 file available
Strategic plan
450 days before RFP
The CIP records construction of FWRC DAFT 5, including related piping and polymer-system replacements, with Substantial Completion planned for November 2026.
See 2 sourcesHide sources
19011 FWRC DAFT 5 Current Project Costs Design Construction Total Agreements\* Amendments Total Paid-to-Date Contracts Change Orders Total Paid-to-Date Commitments Paid to Date 2,486,660 0 2,486,660 2,112,975 18,121,000 0 18,121,000 2,361,508 20,607,660 4,474,482 \*Agreements Include Engineering Services During Construction (ESDC), does not include…
Clark County Water Reclamation District Capital Improvement Plan 2025-2030
The CIP records a planned ISTF rehabilitation of the grit chamber and automated bar screen assembly, with construction milestones scheduled from 2028 through 2030.
See 3 sourcesHide sources
PLN290 ISTF GRIT CHAMBER AND BAR SCREEN REHABILITATION Current Project Costs Design Construction Total Agreements\* Amendments Total Paid-to-Date Contracts Change Orders Total Paid-to-Date Commitments Paid to Date 0 0 0 0 0 0 0 0 0 0 \*Agreements Include Engineering Services During Construction (ESDC), does not include Miscellaneous Expenses Source Of…
Strategic plan
The CIP records ongoing Whitney Lift Station rehabilitation that includes construction of a new bar screen facility, with construction 23% complete.
See sourceHide source
19100 WHITNEY LIFT STATION REHABILITATION Current Project Costs Design Construction Total Agreements\* Amendments Total Paid-to-Date Contracts Change Orders Total Paid-to-Date Commitments Paid to Date 6,314,032 165,392 6,479,424 5,874,414 99,253,641 0 99,253,641 21,369,006 105,733,065 27,243,420 \*Agreements Include Engineering Services During Construction…
Capital improvement plan
133 days before RFP
The CIP proposed rehabilitation or replacement of MVTF secondary-clarifier mechanical equipment, with construction award planned for July 2032.
See sourceHide source
PLN302 MVTF SECONDARY CLARIFIER AND PUMP ROOM REHABILITATION Current Project Costs Design Construction Total Agreements\* Amendments Total Paid-to-Date Contracts Change Orders Total Paid-to-Date Commitments Paid to Date 0 0 0 0 0 0 0 0 0 0 \*Agreements Include Engineering Services During Construction (ESDC), does not include Miscellaneous Expenses Source Of…
Clark County Water Reclamation District Five-Year Capital Improvement Plan 2026-2031
RFP published
ITB 270014 Solicitation DocumentPDF
Proposals due (19 days left)
Clark County Water Reclamation District Capital Improvement Plan 2025-2030
This project will provide the design, bid services, and engineering services during construction for the rehabilitation of several of the major unit process areas at the Indian Springs Treatment Facility (ISTF) with the majority of the rehabilitation occurring within Preliminary Treatment . The 2014 IFMP provided an assessment of the existing assemblies and…
Clark County Water Reclamation District Five-Year Capital Improvement Plan 2026-2031
Preventive HVAC maintenance, repair, and optional equipment replacement and upgrade services for the East Bonner County Library District’s Sandpoint facility.
Sealed bids will be received at 300 W. Main Street, Grand Prairie, Texas, and via https://city-of-grand-prairie.public-portal.us.workdayspend.com/ until Tuesday, December 8, 2026, at 2:00 PM (Central Time). Bids will be opened publicly and acknowledged at that time for the purchase of the following: 27005 – Fire Hydrant Maintenance, Repair & Replacement Services An optional Pre-Bid Meeting is scheduled for December 1, 2026 at 10:00 AM, at 620 Small Hill Dr., Grand Prairie, TX 75050. Further information and specifications may be obtained at https://city-of-grand-prairie.public-portal.us.workdayspend.com/ or from the Purchasing Division at (972) 237-8269. The city reserves the right to reject any or all bids and to waive formalities. The city also reserves the right to purchase these items through state-awarded contracts or other intergovernmental agreements when it is in the city’s best interest.
The City of Columbus is seeking a universal term contract for routine maintenance, repair, and replacement of HVAC systems at city facilities. The contractor will service commercial and residential systems, install fixtures and equipment, and troubleshoot HVAC systems and controls. Required response times are within four hours for non-emergency calls and within 60 minutes for emergencies.