CityMS
Posted
Sep 24, 2026
Oct 26, 2026
Sanitary Sewer Improvements Howell Loop Lift Station RFP
Work inlcudes improvements include the installation and construction of a sewer lift station.
Description: Project includes 2,124 SF of 1/2" Mortarchem Structural Mortar on Wet Well Walls; 354 Gal Surface Preparation: Hydroblast & Clean Lift Station walls per the specifications for Super Nova prior to applying; Miscellaneous Wet Well Repairs. Furnish all Labor, materials and equipment to perform miscellaneous repairs to the Wet Well as directed by the District Engineer.
SpecialDistrict · TX, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityMS
Posted
Sep 24, 2026
Oct 26, 2026
Work inlcudes improvements include the installation and construction of a sewer lift station.
Jackrabbit Road Public Utility District
Special DistrictTX
Posted
Oct 12, 2026
Nov 5, 2026
Work includes mobilization, bypass pumping for lift station including addition of bypass fittings on discharge header, demolition, grit, silt, and debris removal from lift station wet well, install new riser piping (5), clear check valves (5), blast and recoat discharge and header piping, prepare and recoat wet well with sewpercoat, install bypass connection and valves on 20-inch force main, bypass pumping for collector box, 3 CY grit, silt, and debris removal from collector box, 3 EA new manhole ring and cover at collector box. See attached file.
CityFL
Posted
Sep 18, 2026
Oct 28, 2026
Work includes pump station demolition, 4 CY concrete fill, 4 EA bend base leveling pads, 50 LF 10" dip piping (including fittings, reducers, flanges, spool pieces, etc. ), 4 EA 10" di check valve, 2 EA 12" di check valve, 4 EA 10" di gate valve, electrical (complete). See attached file.
CityIL
Posted
Sep 11, 2026
Oct 22, 2026
Replacing influent submersible pumps/electrical and new VFDs, new mag meter/metering vault, relocating existing aerators and adding new aerators to the lagoon, removal and disposal of rock filter, new effluent flow structure, new Parshall flume metering vault/equipment, modifications to existing chlorine contact tank and associated sitework and electrical.