FY2024 CDBG Flooding Street & Drainage Improvements
FY2024 CDBG Flooding, Street, & Drainage System Improvements. Consists of furnishing all labor, materials & equipment necessary to construct the project.
Description: Cured-In-Place Pipe rehabilitation of approx. 238 LF of 24" clay pipe and 10 VF of drainage structures along with a point repair on an 18" clay pipe, one (1) cast-in-place conflict box, one (1) cast-in-place junction box with access cover and the removal and replacement of five (5) curb inlet tops.
City · AL, US
Solicitation files and supporting documents for this bid.
These related opportunities are still open for bidding.
CountyGA
Posted
Nov 2, 2026
Dec 3, 2026
FY2024 CDBG Flooding, Street, & Drainage System Improvements. Consists of furnishing all labor, materials & equipment necessary to construct the project.
CityTX
Posted
Oct 31, 2026
Nov 24, 2026
Provide all labor, materials, and equipment necessary for the demolition and construction of the proposed drainage and irrigation improvements, including culvert, rcp, irrigation piping, excavation, embankment, ditch work, and site cleanup.
CityIL
Posted
Nov 8, 2026
Nov 24, 2026
Construction of a new pump station, embankment berm, chain-link fencing, and seeding, with decommissioning of the existing pump station.
CityCA
Posted
Nov 6, 2026
Dec 2, 2026
The project installs approximately 1,900 linear feet of storm drain infrastructure along Cassidy Street and S. Nevada St. to reduce local flooding. The work includes trenching, paving, and installation of storm inlets and gutters. The contractor is responsible for site conditions, erosion control, and traffic control.