Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
MTA - NYC Transit seeks proposals for the renewal of the Washington Heights Substation, involving decommissioning, removal, disposal, upgrade, and replacement of traction power equipment, installation of Property Line Boxes, feeder cables, and refurbishment of crew facilities and crane controls. This is an A + B Bidding Contract.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Onondaga County in New York is soliciting bids to furnish materials and/or services for the Metro Substation Asset Renewal Project. The solicitation was published on December 16, 2025 and bids are due February 12, 2026 at 2:00 PM EST via BidNet Direct. Full specifications and documents are available to registered vendors on the BidNet Direct portal.
Posted Date
Dec 16, 2025
Due Date
Feb 12, 2026
Release: Dec 16, 2025
Close: Feb 12, 2026
Onondaga County in New York is soliciting bids to furnish materials and/or services for the Metro Substation Asset Renewal Project. The solicitation was published on December 16, 2025 and bids are due February 12, 2026 at 2:00 PM EST via BidNet Direct. Full specifications and documents are available to registered vendors on the BidNet Direct portal.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for the removal of existing drainage infrastructure and installation of a new box culvert across Washington Avenue, including elevation and repaving of the roadway, and replacement of existing utilities.
Posted Date
Dec 14, 2025
Due Date
Jan 21, 2026
Release: Dec 14, 2025
Close: Jan 21, 2026
This RFP is for the removal of existing drainage infrastructure and installation of a new box culvert across Washington Avenue, including elevation and repaving of the roadway, and replacement of existing utilities.
AvailableRehabilitation of hunter south substation and replacement of components at hunter north substation and Circuit Breaker House 563 (CBH-563). Work at HSS includes the decommissioning, removal, disposal, upgrade, and/or replacement of existing traction power equipment, including high-tension switchgear, power transformer, rectifier, DC breaker lineup, and both high-tension and low-tension Con Edison services. Work at HNS includes decommissioning, removal, disposal, upgrade, and replacement of high-tension switchgear. Work at CBH-563 includes the decommissioning and replacement of DC breakers. Construction and installation of new property line boxes, ducts, removal and replacement of positive and negative cabling, as well as various repairs of structural and architectural elements will also be performed. Environmental abatement (including asbestos) is also part of this Project.
Posted Date
Oct 24, 2025
Due Date
Jan 8, 2026
Release: Oct 24, 2025
Close: Jan 8, 2026
Rehabilitation of hunter south substation and replacement of components at hunter north substation and Circuit Breaker House 563 (CBH-563). Work at HSS includes the decommissioning, removal, disposal, upgrade, and/or replacement of existing traction power equipment, including high-tension switchgear, power transformer, rectifier, DC breaker lineup, and both high-tension and low-tension Con Edison services. Work at HNS includes decommissioning, removal, disposal, upgrade, and replacement of high-tension switchgear. Work at CBH-563 includes the decommissioning and replacement of DC breakers. Construction and installation of new property line boxes, ducts, removal and replacement of positive and negative cabling, as well as various repairs of structural and architectural elements will also be performed. Environmental abatement (including asbestos) is also part of this Project.
AvailableWork includes design, manufacture, testing, and delivery of the substation expansion - substation steel and equipment. The work for which bids are to be received consists of: design of substation steel structures, structure foundations, and substation ground grid. Providing all materials for the substation structures and ground grid. Providing all station insulators, switches, and bus work.
Posted Date
Nov 22, 2025
Due Date
Jan 8, 2026
Release: Nov 22, 2025
Close: Jan 8, 2026
Work includes design, manufacture, testing, and delivery of the substation expansion - substation steel and equipment. The work for which bids are to be received consists of: design of substation steel structures, structure foundations, and substation ground grid. Providing all materials for the substation structures and ground grid. Providing all station insulators, switches, and bus work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →