Summary
Work consists of road reconstruction includes 9,368 SY of pavement removal; 2,178 LF of curb, concrete, remove; 2,661 SY of sidewalk concrete, remove; 109 TON of compacted aggregate, no. 53, temporary for driveways; 15,891 LF of void reducing asphalt membrane for hma; 20 SY of sidewalk, concrete, reconstruct; 3,381 LF of curb and gutter, concrete; 80 LF of pipe, ductile iron, diameter 10"; 337 LFf of sign post, square, type 1, reinforced anchor base; 2,570 LF of line, thermoplastic, solid, white, 6"; 4,794 LF of line, thermoplastic, solid, yellow, 6"; 264 LF of transverse marking, thermoplastic, stop line, white, 24"; 793 LF of transverse marking, thermoplastic, crosswalk line, white, 6"; see outside link & attached file.