Oregon Department of Transportation
State AgencyOR
Posted
Nov 12, 2026
Dec 17, 2026
Southwest Oregon 2024-2027 ADA Curb Ramps, Phase 2 RFP
Grading, drainage, paving, curb ramps, signing, signals & roadside development includes 367 ton contaminated soil disposal, 14,350 foot asphalt pavement sawcutting 6 to 14" deep, 3,780 LF concrete sawcutting less than 6" deep, 185 LF mainline video inspection, 40 LF 4" drain pipe, 45 LF 12" storm sewer pipe 10 FT depth, 1 EA concrete storm sewer manholes.
