Esb I5 Albany Row Fencing RFP
Posted
Nov 5, 2026
Nov 24, 2026
Work consists of remove and replace and install new right-of-way fencing, and install a new access gate.
Track open bid opportunities, contracts, public meetings, and key contacts for Oregon Department of Transportation.
Active opportunities open for bidding
Posted
Nov 5, 2026
Nov 24, 2026
Work consists of remove and replace and install new right-of-way fencing, and install a new access gate.
Posted
Nov 19, 2026
Dec 17, 2026
This notice solicits bids for multiple Oregon Department of Transportation construction projects, including roadway, drainage, paving, curb ramp installation, traffic control, and related landscaping and utility work. Projects listed include the Beaverton Downtown Loop Phase 1 demolition and Jackson County Curb Ramps Phase 4, with scopes covering earthwork, concrete paving, aggregate base, striping, signage, and other highway appurtenances. Contracts include federal Buy America and minimum wage requirements, fuel escalation clauses, and require contractors to perform at least 30% of the work with their own organization.
Posted
Nov 19, 2026
Dec 10, 2026
This notice solicits construction bids for multiple Oregon Department of Transportation highway and bridge projects, including rumble strip restoration on OR331, a trail crossing project on US30B, the Lostine River–Caudle Lane bridge, and Portland Metro ADA curb ramp work among others. Work types include asphalt concrete paving and oiling, earthwork and drainage, bridges and structures, miscellaneous highway appurtenances, electrical, traffic control, erosion and sediment control, concrete and paving, utility work, and associated construction operations. Projects specify individual completion times, federal Buy America and prevailing wage requirements, fuel escalation clauses, and some contain Indian employment preference goals or special insurance requirements such as railroad insurance.
Posted
Nov 19, 2026
Jan 7, 2027
Removal of existing metal roofs, insulation and gutters and installation of new metal roofs, insulation and gutters on three separate buildings at the ODOT Davis Slough Maintenance Facility. Each building has separate requirements as shown on the plans. TOTAL PROJECT COST
Posted
Nov 19, 2026
Dec 3, 2026
ODOT is seeking one qualified contractor to replace two existing variable message signs with new, agency furnished ones. Enter total price here. Submit line item pricing by uploading Attachment C - Bid Pricing Form.
Posted
Nov 19, 2026
Dec 10, 2026
ODOT is seeking 1 qualified Contractor to provide tow-type snow plow trailers with mounted stainless steel sanders and deicer pre-wet systems, with installation on ODOT supplied chassis. These units must be hydraulically powered by the truck hydraulics. The tow-type plow and its attachments will be used by crews day and night, in winter weather conditions for daily highway maintenance operations. Enter pricing on the Bid Pricing Form found on the Attachments tab. Upload the completed Bid Pricing Form with your Bid.
Posted
Nov 18, 2026
Dec 9, 2026
Four coastal landslide geotechnical subsurface investigations including drilling and sampling. SPR881_Coastal_Drilling Total Bid Amount
Posted
Nov 18, 2026
Dec 2, 2026
The solicitation seeks to establish a contract to purchase and install one 6'x12' CNC plasma cutting table including the cutting system, associated equipment, software, and installation. The procurement also includes operator and maintenance training (16 hours). The contract is for the benefit of the Oregon Department of Transportation, Bend Shop (Maintenance & Operations).
Posted
Nov 17, 2026
Jan 5, 2027
The Oregon Department of Transportation seeks new price agreements for statewide on-call land surveying services. The solicitation uses a competitive sealed proposal process, with an agreement period listed as April 15, 2027, through April 15, 2032. Responses are due January 5, 2027.
Posted
Nov 16, 2026
Jan 6, 2027
Next iteration of Contract B36280. Sample Draft Contract will be provided. Please assign to Ivory Williams, Joni Sirovatka, David Brudnok, or Melanie McMurrick as work load permits as these staff are experienced with FTA procurements.
Key metrics and characteristics
City
The city where this buyer is located.
Salem
County
The county where this buyer is located.
Marion
Address
Physical address of this buyer.
355 Capitol St NE
Phone Number
Contact phone number for this buyer.
(888) 275-6368
Zip Code
Postal code for this buyer's location.
97301-3871
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
Startup Friendliness
How often this buyer champions startups and early adoption.
Latest Budget Year
Unlock to view
Operating Budget
Unlock to view
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
AI-ranked best-fit opportunities before bid boards
Auto-drafted, compliance-ready outlines & boilerplate
Competitor & pricing intel from past awards
Procurement guidance and navigation tips.
These are suggested options, not confirmed memberships or past purchases. Our team can help confirm the right purchasing path for this agency.



Track vendor wins and renewal opportunities
This document is an order form detailing an annual subscription for Granicus's Communications Cloud service for the Oregon Department of Transportation. The service period is from July 1, 2024, to June 30, 2025, with an annual fee of $30,375.33. The contract, identified by Order #Q-337461, includes product descriptions, information on subscriber data, and general terms and conditions, referencing an existing Oregon Price Agreement.
This Purchase Order (PO00038620) is for the procurement of various Adobe software products and bundles, including Adobe Sign, Adobe Acrobat Pro, Adobe Creative Cloud, and Adobe ColdFusion Enterprise. The services are provided for a period from November 3, 2024, to November 2, 2025, with a total cost of 387,469.46 USD. The order was placed on October 30, 2024.
This document outlines the approval and invoicing for the renewal of Gov Delivery (Communications Cloud) services provided by Granicus to the OR Department of Transportation. The service term is from July 1, 2022, to June 30, 2023, with a total cost of $28,388.16, as detailed in Invoice #154824.
This document outlines an order for various Adobe software licenses, including Adobe Sign, Acrobat Pro, Creative Cloud Pro, and ColdFusion Enterprise, for the OR-Department of Transportation. The order is placed through SHI, acting as a Value Added Reseller under NASPO Contract CTR060028 and Subcontract #PO-10700-00014971. The coverage term for all licenses is from November 3, 2024, to November 2, 2025.
This Amendment outlines the terms for 'Option Year Two' of an agreement between a partner and Adobe, covering various Adobe products and professional services. The services, including Acrobat Sign, Creative Cloud, Document Cloud, and ColdFusion, commenced on 3 October 2022, as part of a multi-year license term that includes a Base Year and two Option Years, concluding on 2 October 2025. The document specifies quantities for each service but does not include pricing. It also sets a signing deadline of 02 October 2022.
Board meetings and strategic plans from Oregon Department of Transportation
The commission reviewed detailed reports on wildfire impacts from multiple ODOT districts, focusing on operational costs, road closure challenges, and coordination between fire crews and transportation authorities. Discussions included Oregon Transportation Commission updates on project delivery metrics and federal fund redistribution, alongside Region 5 operational reports covering interchange congestion, broadband right-of-way policies, and maintenance scheduling. The board also addressed current construction statuses, local agency funding opportunities, and broad updates on public transit, including intercommunity ridership performance, transit facility construction, and the status of coordinated human services transportation planning.
The meeting included public comments regarding the I-5 Rose Quarter Improvement Project, focusing on the importance of the project for regional transportation safety, freight movement, and economic opportunities for diverse contractors. Speakers also addressed concerns about the Interstate Bridge Project and the Abernathy Project, specifically questioning financial transparency, project scheduling, and the practice of funding projects on a piecemeal basis. Additionally, there were discussions regarding a proposed trail alignment, motorcycle safety and inclusion in transportation planning, and the creation of a project management group for the Rose Quarter project.
Public-sector contacts connected to Oregon Department of Transportation.
Native sync to Salesforce & HubSpot
See expiring contracts, renewal timing, pricing history, and competitor awards, then sync the data to your CRM.
Expiring contracts, renewals, and award history
Competitor contract data and source files
Budget and spend signals to prioritize accounts
Native sync to Salesforce and HubSpot
The commission held a meeting to discuss the Interstate Bridge Replacement (IBR) Statewide Transportation Improvement Program (STIP) amendment. This included a recap of previous project presentations and a request to increase funding for the IBR program. Commissioners discussed governance, risk oversight, cost management, and tolling analysis. The commission ultimately approved the motion to increase funding for the IBR program within the 2024-2027 STIP.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Oregon Department of Transportation meetings, strategic plans, and budget discussions before the public bid appears.
Early signals from meeting minutes and plans
Vendor mentions and competitor tracking
Decision timeline from discussion to RFP
Quotable insights from buyer leadership