CityCA
Jul 30, 2026
Closes
Aug 27, 2026
High Voltage Streetlight Conversion Phase 4 Project RFP
Work includes 122 EA remove luminaire; 1 LS remove striping, pavement markings and pavement markers; 5,900 SY 2" full width grinding (asphalt concrete); 670 TON hot mix asphalt (type A) - overlay; 1,700 LF thermoplastic traffic stripe; 200 LF thermoplastic traffic stripe (12" wide); 600 LF thermoplastic traffic stripe (24" wide); 100 SF thermoplastic pavement marking (arrows, symbols words); 11 EA post top LED luminaire; 105 EA 1.5" conduit connection to existing foundation stub; 24,300 LF 2" conduit and trenching. See outside link.