East Bay Municipal Utility District
Special DistrictCA
Posted
Sep 29, 2026
Dec 2, 2026
Walnut Creek WTP Filters Improvements RFP
Work consists of water treatment plant filters improvements, includes demolish existing wheeler bottom underdrains; replace and provide new underdrains, troughs, media, stop logs, applied channel overflow pipes, valves, and gaskets; demolish existing surface wash piping; furnish, install, and demolish temporary surface wash piping. Furnish and install new air scour piping. D. Furnish and install new lighting panel; replace and provide new troughs and valves; investigate and repair the water leak at filter 5 right (5r) filter box.
