Summary
Construction of approx. 1,030 LF of storm sewer and other work. Including 438 LF of 15" Dia. HDPE, including saw cut, excavation, disposal of all excavated materials, full depth stone backfill, connection to new inlets, and temporary paving, complete in-place; 341 LF of 18" Dia. HDPE, including saw cut, excavation, disposal of all excavated materials, full depth stone backfill, connection to new inlets, and temporary paving, complete in-place; 252 LF of 24" Dia. HDPE, including saw cut, excavation, disposal of all excavated materials, full depth stone backfill, connection to new inlets, and temporary paving, complete in-place; 9 SY Rip Rap Apron, including bypass pumping, erosion and sedimentation controls, excavation, disposal of excavated material, geotextile, and installation of rip rap, complete in place; 120 LF Concrete Curb Replacement, including removal of existing, concrete curb, and temporary pavement restoration, complete in-place; 50 SF Concrete Sidewalk, including removal of existing, concrete sidewalk, complete in-place; 900 SY Milling – mill full width, 10.5" depth; 100 SY Subbase Repair – excavate 8" depth, install class 4 geotextile, place and compact 8" depth AASHTO No. 1 stone, complete in-place. See attached file.