Open RFP

Wallula Dodd Water System - Raindance-Railex Water Line Extension Phase 2 RFP

Description: The Project includes the following Phase 2 Work: Installation of approx. 2,460 LF of 18" ductile iron water main; 130 LF of 30" steel casing, of which 60 LF is to be installed by jack-and-bore method and 70 LF is to be installed by open trench method; 230 LF of 18 " high density polyethylene water main, of which 130 LF is to be installed inside the new steel casing; three hydrant assemblies; two 18" butterfly valves; 2,690 LF of 2" conduit; junction boxes; gravel surface restoration; hydroseeding; general surface restoration; and other related work.

Buyer
Port Of Walla Walla

SpecialDistrict · WA, US

Released
Aug 12, 2026
Closes
Sep 3, 2026(17 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts