Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Blaine
Work includes clearing and grubbing; 2,571 CY of excavation; 20 SY of bituminous patch special; 177 LF of 6" of DIP watermain; 207 LF of 18" RC pipe sewer CL V; 14 SY of 4" insulation; 10 EA of curb stop casting; 1 EA of salvage sign and post; 11 EA of connect of existing storm sewer; 83 SF of manhole baffle; 8,185 LF of concrete curb and gutter; 2,376 SF of 4" concrete sidewalk; 16 SF of truncated domes; 24 EA of repair irrigation; 1,165 LF of sediment control; 10,913 SY of sodding;
Posted Date
Mar 27, 2026
Due Date
Apr 21, 2026
Release: Mar 27, 2026
City of Blaine
Close: Apr 21, 2026
Work includes clearing and grubbing; 2,571 CY of excavation; 20 SY of bituminous patch special; 177 LF of 6" of DIP watermain; 207 LF of 18" RC pipe sewer CL V; 14 SY of 4" insulation; 10 EA of curb stop casting; 1 EA of salvage sign and post; 11 EA of connect of existing storm sewer; 83 SF of manhole baffle; 8,185 LF of concrete curb and gutter; 2,376 SF of 4" concrete sidewalk; 16 SF of truncated domes; 24 EA of repair irrigation; 1,165 LF of sediment control; 10,913 SY of sodding;
AvailableCity of Blaine
Furnishing of all work and materials for reconstruction consisting of approximately: 244 CY - Excavation - Common (EV) (P) 268 CY - Aggregate Base (Class 5) 391 SY - Concrete Pavement 8-inch 94 TON - Bituminous Pavement SPWEB240C 86 LF - Concrete Curb and Gutter, Design B412 48 LF - 8-inch Concrete Valley Gutter 1,110 LF - Electrical Conduit 3/4 inch to 1.5 inch 770 LF - #10 AWG Wire 1 LS - Fuel Tank Monitoring System Upgrades 2 EA - Modify Electrical Panel 1 LS - Install Tank Monitoring System 10 EA - Replace Fuel System Access Cover (Including all related work and appurtenances).
Posted Date
Mar 20, 2026
Due Date
Apr 14, 2026
Release: Mar 20, 2026
City of Blaine
Close: Apr 14, 2026
Furnishing of all work and materials for reconstruction consisting of approximately: 244 CY - Excavation - Common (EV) (P) 268 CY - Aggregate Base (Class 5) 391 SY - Concrete Pavement 8-inch 94 TON - Bituminous Pavement SPWEB240C 86 LF - Concrete Curb and Gutter, Design B412 48 LF - 8-inch Concrete Valley Gutter 1,110 LF - Electrical Conduit 3/4 inch to 1.5 inch 770 LF - #10 AWG Wire 1 LS - Fuel Tank Monitoring System Upgrades 2 EA - Modify Electrical Panel 1 LS - Install Tank Monitoring System 10 EA - Replace Fuel System Access Cover (Including all related work and appurtenances).
AvailableCity of Blaine
Pavement markings - various city streets. Work includes 20,165 LF of 4" yellow skip 10/40 cycle; 42,532 LF of 4" yellow solid; 94,147 LF of 4" double yellow; 11,650 LF of 4" white skip 10/40 cycle; 214,805 LF of 4" white solid; 280 LF of 8" white skip; 21,654 SF of 3' x 6' white solid crosswalk; 248 LF of 4" solid white crosswalk; 441 LF of 12"x36" yield markings; 857 LF of 24" stop bar; 3,155 LF of 24" yellow median.
Posted Date
Feb 10, 2026
Due Date
Mar 5, 2026
Release: Feb 10, 2026
City of Blaine
Close: Mar 5, 2026
Pavement markings - various city streets. Work includes 20,165 LF of 4" yellow skip 10/40 cycle; 42,532 LF of 4" yellow solid; 94,147 LF of 4" double yellow; 11,650 LF of 4" white skip 10/40 cycle; 214,805 LF of 4" white solid; 280 LF of 8" white skip; 21,654 SF of 3' x 6' white solid crosswalk; 248 LF of 4" solid white crosswalk; 441 LF of 12"x36" yield markings; 857 LF of 24" stop bar; 3,155 LF of 24" yellow median.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Only if truly unique and defensible; requires a justification letter and City Council approval. Otherwise pivot back to a coop.
Coops: If your product is on MN CPV or OMNIA, ask to buy via that contract to bypass the $50,000 bid threshold. Confirm with Purchasing.
Entity: City of Blaine, MN.
Use is rare. Requires a formal justification letter and City Council approval. Given the city’s low $50,000 bid threshold and high process friction, deprioritize this path and pivot to cooperative purchasing where possible.
Board meetings and strategic plans from City of Blaine
The City of Blaine's 2023-2026 strategic plan outlines six strategic priorities aimed at enhancing the city. These priorities include financial sustainability, economic development, infrastructure management, organizational health, collaboration and engagement, and improvements to Highway 65. The plan emphasizes delivering exceptional public services with professionalism and accountability, with the vision of Blaine being a desirable home for residents, a thriving place for businesses, and an attractive destination for visitors.
The City of Blaine's 2023-2026 Strategic Plan outlines six key priorities: Financial Sustainability, Economic Development, Infrastructure Management, Organizational Health, Collaboration and Engagement, and TH 65 Improvement. The plan aims to achieve financial stability, promote thoughtful growth and renewal, ensure reliable infrastructure, build organizational capacity, foster community engagement, and improve transportation. Specific initiatives are detailed for each priority, with measurable outcomes and targets established to track progress. The plan was developed through a process involving environmental scanning, SWOT analysis, and a strategic planning session with city leadership.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Blaine's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database