Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes removal and replacement of existing filter media is Filters 1, 2 and 3 at the WTP as well as additional crack repair and concrete coating on the interior of the filters.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Project generally consists of the following Construction Contract: Contract No. 1 Marshall MU WTP Residuals Improvements. Replacement of the sludge press control panels and replacement of the residuals building air compressor and air dryer.
Posted Date
Jan 20, 2026
Due Date
Feb 17, 2026
Release: Jan 20, 2026
Close: Feb 17, 2026
The Project generally consists of the following Construction Contract: Contract No. 1 Marshall MU WTP Residuals Improvements. Replacement of the sludge press control panels and replacement of the residuals building air compressor and air dryer.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project will consist of the construction of three new dual-bed twocell gravity filters equipped with media and leopold type xa underdrain systems. Other contruction will include: new filter effluent, backwash, and rewash pipes installed in the filter building pipe gallery; new air scour piping to support new filters; civil improvements associated with new wash water main serving new filters discharging into existing circular gravity thickener; new asphalt roadway to filters and retacking existing asphalt roadways; improving exterior concrete stairs; relocating hvac condensing unit and refrigerant lines; demolition of supply fans in the high service pump building and ancillary electrical and instrumentation improvements.
Posted Date
Dec 19, 2025
Due Date
Feb 27, 2026
Release: Dec 19, 2025
Close: Feb 27, 2026
Project will consist of the construction of three new dual-bed twocell gravity filters equipped with media and leopold type xa underdrain systems. Other contruction will include: new filter effluent, backwash, and rewash pipes installed in the filter building pipe gallery; new air scour piping to support new filters; civil improvements associated with new wash water main serving new filters discharging into existing circular gravity thickener; new asphalt roadway to filters and retacking existing asphalt roadways; improving exterior concrete stairs; relocating hvac condensing unit and refrigerant lines; demolition of supply fans in the high service pump building and ancillary electrical and instrumentation improvements.
AvailableSchertz-Seguin Local Government Corporation is soliciting sealed bids for improvements to the Gonzales Water Treatment Plant chlorine storage room. The work includes new concrete pads, gas detection, room heaters, FRP doors, replacement of a chlorine pipe manifold, 1‑ton scales and indicators, decommissioning of the chlorine dioxide system, SCADA integration, and associated electrical work. Bids must be submitted electronically via the City of Seguin’s BidNetDirect portal by the stated closing date and time.
Posted Date
-
Due Date
Mar 3, 2026
Close: Mar 3, 2026
Schertz-Seguin Local Government Corporation is soliciting sealed bids for improvements to the Gonzales Water Treatment Plant chlorine storage room. The work includes new concrete pads, gas detection, room heaters, FRP doors, replacement of a chlorine pipe manifold, 1‑ton scales and indicators, decommissioning of the chlorine dioxide system, SCADA integration, and associated electrical work. Bids must be submitted electronically via the City of Seguin’s BidNetDirect portal by the stated closing date and time.
AvailableInstallation of new Liquid Lime and Liquid Zinc Orthophosphate feed systems and decommissioning and removal of the existing hydrated lime system. The scope includes construction of a new lime storage/ feed building, electrical/controls and valving and piping related work.
Posted Date
Jan 10, 2026
Due Date
Feb 3, 2026
Release: Jan 10, 2026
Close: Feb 3, 2026
Installation of new Liquid Lime and Liquid Zinc Orthophosphate feed systems and decommissioning and removal of the existing hydrated lime system. The scope includes construction of a new lime storage/ feed building, electrical/controls and valving and piping related work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →