Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Schertz-Seguin Local Government Corporation is soliciting sealed bids for improvements to the Gonzales Water Treatment Plant chlorine storage room. The work includes new concrete pads, gas detection, room heaters, FRP doors, replacement of a chlorine pipe manifold, 1‑ton scales and indicators, decommissioning of the chlorine dioxide system, SCADA integration, and associated electrical work. Bids must be submitted electronically via the City of Seguin’s BidNetDirect portal by the stated closing date and time.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project will include removal of two (2), docs 80 oxygen concentrators housed within the existing water treatment plant, along with related air ducts and piping. The project will include preparation of the site through base and subbase removal in preparation for 12" outdoor concrete slab. The project will include a 12" bulk oxygen equipment concrete slab to the northeast end of the existing water treatment plant; the concrete slab will have a fenced section with 2 gates for the outdoor bulk oxygen storage. The project will include installation of a bulk oxygen storage system comprised of the following: one (1) 715-gallon cryogenic bulk lox storage tank, one (1) vaporizer assembly, one (1) manifold/pressure regulating/switchover assembly, one (1) back-up high pressure gas oxygen cylinder system and the associated exterior and interior o2 service. The new bulk oxygen system will have electrical and controls systems connecting into the existing wtp system. The project will include interior piping connections with a 3" building core and seal. The project also includes replacement of (20) pneumatic valves, (6) mag meters, (3) tank inspections, (2) pump inspections/servicings within the existing wtp.
Posted Date
Dec 4, 2025
Due Date
Jan 21, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Dec 4, 2025
Close: Jan 21, 2026
Project will include removal of two (2), docs 80 oxygen concentrators housed within the existing water treatment plant, along with related air ducts and piping. The project will include preparation of the site through base and subbase removal in preparation for 12" outdoor concrete slab. The project will include a 12" bulk oxygen equipment concrete slab to the northeast end of the existing water treatment plant; the concrete slab will have a fenced section with 2 gates for the outdoor bulk oxygen storage. The project will include installation of a bulk oxygen storage system comprised of the following: one (1) 715-gallon cryogenic bulk lox storage tank, one (1) vaporizer assembly, one (1) manifold/pressure regulating/switchover assembly, one (1) back-up high pressure gas oxygen cylinder system and the associated exterior and interior o2 service. The new bulk oxygen system will have electrical and controls systems connecting into the existing wtp system. The project will include interior piping connections with a 3" building core and seal. The project also includes replacement of (20) pneumatic valves, (6) mag meters, (3) tank inspections, (2) pump inspections/servicings within the existing wtp.
AvailableSeeking qualified and licensed contractors for improvements to evidence room facilities at two municipal locations. Work includes interior room improvements; install new ceiling tiles; paint walls and ceilings; install new vinyl flooring in the following rooms: room 1: 5 feet 3" by 7 feet, room 2: 33 feet by 15 feet; door and wall modifications; cut existing wall and install one (1) new 32" h pre-hung steel door; security gate installation; furnish and install one (1) metal accordion-style security gate; gate dimensions: approx 9 feet tall by 15 feet wide.
Posted Date
Jan 2, 2026
Due Date
Jan 20, 2026
Release: Jan 2, 2026
Close: Jan 20, 2026
Seeking qualified and licensed contractors for improvements to evidence room facilities at two municipal locations. Work includes interior room improvements; install new ceiling tiles; paint walls and ceilings; install new vinyl flooring in the following rooms: room 1: 5 feet 3" by 7 feet, room 2: 33 feet by 15 feet; door and wall modifications; cut existing wall and install one (1) new 32" h pre-hung steel door; security gate installation; furnish and install one (1) metal accordion-style security gate; gate dimensions: approx 9 feet tall by 15 feet wide.
AvailableWork consist of demolition and removal of existing chlorine system and associated equipment, furnish and install complete chlorine storage and feed system (including vacuum regulators, automatic switchover, feeders, ejectors, scales, trunnions, piping, valves, and appurtenances), furnish and install chlorine safety and monitoring equipment (leak detection, emergency shutoff valves, control panel, panic button, signage), electrical power systems (panels, breakers, transformers, heaters, exhaust fans, wiring, supports, surge protection), instrumentation, controls, plc/rtu hardware, programming, integration, loop checks, and precommissioning. See attached file.
Posted Date
Jan 12, 2026
Due Date
Feb 4, 2026
Release: Jan 12, 2026
Close: Feb 4, 2026
Work consist of demolition and removal of existing chlorine system and associated equipment, furnish and install complete chlorine storage and feed system (including vacuum regulators, automatic switchover, feeders, ejectors, scales, trunnions, piping, valves, and appurtenances), furnish and install chlorine safety and monitoring equipment (leak detection, emergency shutoff valves, control panel, panic button, signage), electrical power systems (panels, breakers, transformers, heaters, exhaust fans, wiring, supports, surge protection), instrumentation, controls, plc/rtu hardware, programming, integration, loop checks, and precommissioning. See attached file.
AvailableWork includes installation of two (2) new 100 HP vertical turbine well pumps in existing wells; new fiberglass screen panels for existing tray aerators; replacement of existing high services pumps with four (4) new 50 HP split case high service pumps with VFDs; sodium hypochlorite metering pumps and storage tanks; two (2) 5,000 gallon hydropneumatic tanks; new aluminum stairs to existing ground storage tanks; yard piping; sitework; and electrical with new diesel fired emergency generator.
Posted Date
-
Due Date
Jan 20, 2026
Release: -
Close: Jan 20, 2026
Work includes installation of two (2) new 100 HP vertical turbine well pumps in existing wells; new fiberglass screen panels for existing tray aerators; replacement of existing high services pumps with four (4) new 50 HP split case high service pumps with VFDs; sodium hypochlorite metering pumps and storage tanks; two (2) 5,000 gallon hydropneumatic tanks; new aluminum stairs to existing ground storage tanks; yard piping; sitework; and electrical with new diesel fired emergency generator.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →