Closing soon

Wake County Drainage, Grading, and Paving on SR 1301 (Sunset Lake Rd) RFP

Description: Work includes 3,700 CY unclassified excavation; 100 CY undercut excavation; 100 CY select granular material; 100 SY geotextile for soil stabilization; 309.5 ton foundation conditioning material, minor structures; 316 LF 18" drainage pipe; 20 LF 15" RC pipe culverts, class iii;; 92 LF 15" RC pipe culverts, class iv; 1,184 LF 18" rc pipe culverts, class iv; 664 LF 24" RC pipe culverts, class iv; 528 LF 30" RC pipe culverts, class iv; 1,288 LF pipe removal; 100 CY shallow undercut; 200 ton class iv subgrade stabilization; 6,300 SY milling asphalt pavement, depth (1. 5).

Released
Jul 16, 2026
Closes
Aug 12, 2026(8 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts