CityTX
Posted
-
Nov 19, 2026
Downtown Improvements Project Ph 1 and 3 RFP
Work includes downtown improvements.
Description: Work includes improvements to roadway, pedestrian facilities, water line, sanitary and storm drainage along with traffic signal modifications.
City · OH, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
Wadsworth City Council adopted authorization for up to $14,844,000 in bonds to pay the costs of the Downtown Improvement Project.
ORDINANCE NO. 26-042: AN ORDINANCE PROVIDING FOR THE ISSUANCE AND SALE OF BONDS IN THE MAXIMUM PRINCIPAL AMOUNT OF $14,844,000 FOR THE PURPOSE OF PAYING THE COSTS OF THE DOWNTOWN IMPROVEMENT PROJECT, AND DECLARING AN EMERGENCY • Sponsored by Council Member Jon Yurchiak • Discussed at Committee of The Whole March 10, 2026 Council Member Yurchiak called the…
Wadsworth City Council Regular City Council Meeting
Board meeting · Apr 7, 2026
Board meeting
Staff recommended traditional design-bid-build delivery with an Owner's Representative for the Downtown Infrastructure Project.
B. Project Delivery Recommendation Dir. Hiscock wished to discuss from staff, as well as Administration, that a more traditional design bid project model be pursued. It was thought this would bring things closer to the budget. In addition, it was thought to be better to use what was called an "Owner's Rep" that acted as a construction manager within the…
Board meeting
Council adopted authority to advertise, receive bids, and award contracts for Downtown Stormwater Improvements along Mills and Pardee Streets.
ORDINANCE NO. 26-097: AN ORDINANCE AUTHORIZING AND DIRECTING THE DIRECTOR OF PUBLIC SERVICE TO ADVERTISE, RECEIVE BIDS AND AWARD CONTRACTS PURSUANT TO ORC 735.05 IN ACCORDANCE WITH THE REQUIREMENTS OF ORC 9.17 FOR THE DOWNTOWN STORMWATER IMPROVEMENTS PROJECT ALONG MILLS AND PARDEE STREETS AND DECLARING AN EMERGENCY • Sponsored by Council Member Zach Berger…
Wadsworth City Council Regular City Council Meeting
Board meeting · Aug 18, 2026
Board meeting
The City anticipated completing 100-percent plans in one to two weeks; if the ordinance were approved, it could advertise the Downtown Infrastructure Project with a bid period of at least four weeks, but it would still need to issue debt before entering into agreements and proceeding with construction, which would not likely begin until late January or early February assuming authorizations and pricing proceeded as anticipated.
6. ORDINANCE NO. 26-109 AN ORDINANCE AUTHORIZING AND DIRECTING THE DIRECTOR OF PUBLIC SERVICE TO ADVERTISE AND RECEIVE BIDS PURSUANT TO ORC 735.05 IN ACCORDANCE WITH THE REQUIREMENTS OF ORC 9.17 FOR THE DOWNTOWN INFRASTRUCTURE PROJECT AND DECLARING AN EMERGENCY Service Director Hiscock explained that this ordinance was related to the preceding legislation…
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (19 days left)
Public Service Committee of Wadsworth City Council Minutes
Board meeting · Aug 11, 2026
The Downtown Project had some stormwater needs. From an engineering perspective, it was determined there was the need to extend the storm pipe down Mills to Pardee and then to a discharge point to the south. This would be separate from the Downtown Project as a prudent move, but not be part of Downtown Phase I this year. This proposal was to hire a firm…
Public Service Committee of Wadsworth City Council Minutes
Board meeting · Aug 11, 2026
Wadsworth City Council Committee Of The Whole Finance Meeting
Board meeting · Sep 15, 2026
Decision makers connected to this RFP from City of Wadsworth.
Adjacent opportunities open for bidding right now.
CityTX
Posted
-
Nov 19, 2026
Work includes downtown improvements.
Missoula Urban Transportation District
Special DistrictMT
Posted
Oct 22, 2026
Nov 16, 2026
Construction of offsite infrastructure, including roadway and site improvements, water, sanitary sewer and storm sewer mains, and stormwater detention.
CityNC
Posted
Oct 16, 2026
Nov 5, 2026
Work include: removal of the historic brick sidewalks, reuse of historic brick and reinstallation to historic standards, concrete paver base, brick curb ramps, crosswalk repainting, granite curb resetting and installation, and removing and replanting street trees.
CityFL
Posted
Oct 7, 2026
Nov 5, 2026
Work includes approx 6,422 LF of 16" PVC DR18 water main pipelines via open-cut; 1 LS 16" HDPE DR 11 water main pipe lines via horizontal directional bore, wire lining; 11 EA 2" connect to water main;