Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Georgetown County Water and Sewer District seeks to furnish, deliver, and start up one belt press dewatering system and associated equipment for the Waccawmaw Neck Water Treatment Plant at 1975 Sandy Island Road, Litchfield, SC. Work must comply with AWWA practices, SCDES requirements, and the Contract Documents. The solicitation was published on December 15, 2025, and bids are due by 2:00 PM EST on February 3, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement for furnishing, delivering, and starting-up one belt press dewatering system and associated equipment for the Waccamaw Neck WTP.
Posted Date
-
Due Date
Feb 3, 2026
Release: -
Close: Feb 3, 2026
Procurement for furnishing, delivering, and starting-up one belt press dewatering system and associated equipment for the Waccamaw Neck WTP.
AvailableReplacement of the Belt Filter Press, Press Feed Pump, Belt Conveyor, Polymer System, installation of HVAC equipment, Electrical work related to the belt press system and HVAC, and associated miscellaneous Work
Posted Date
Dec 15, 2025
Due Date
Jan 30, 2026
Release: Dec 15, 2025
Close: Jan 30, 2026
Replacement of the Belt Filter Press, Press Feed Pump, Belt Conveyor, Polymer System, installation of HVAC equipment, Electrical work related to the belt press system and HVAC, and associated miscellaneous Work
AvailableThe City of Omaha Public Works is soliciting bids for the Papillion Creek Water Resource Recovery Facility (WRRF) Belt Filter Press Expansion at 15705 Harlan Lewis Road. The project increases dewatering capacity by adding two belt filter press units and installing related platforms, sludge feed pumps, process piping, and electrical and controls upgrades. This is a rebid of OPW 53979 with bids due by 11:00 AM CST on January 28, 2026 via the Douglas County IonWave portal.
Posted Date
Dec 24, 2025
Due Date
Jan 28, 2026
Release: Dec 24, 2025
Close: Jan 28, 2026
The City of Omaha Public Works is soliciting bids for the Papillion Creek Water Resource Recovery Facility (WRRF) Belt Filter Press Expansion at 15705 Harlan Lewis Road. The project increases dewatering capacity by adding two belt filter press units and installing related platforms, sludge feed pumps, process piping, and electrical and controls upgrades. This is a rebid of OPW 53979 with bids due by 11:00 AM CST on January 28, 2026 via the Douglas County IonWave portal.
Belt Filter Press No. 3 Installation, the Work, includes, but is not necessarily limited to: Addition of a 3rd BFP of equal capacity as the existing BFP Nos. 1 and 2. Addition of a 3rd dewatered cake pump for BFP No. 3. *Addition of a 3rd dewatered sludge cake piping to discharge to an existing storage silo or directly to a sludge hauling trailer. Addition of a 4th sludge feed pump and new piping to BFP No. 3. Modify existing polymer feed system to provide polymer feed for BFP No. 3. New HVAC design to accommodate BFP No. 3. Modify HVAC system to address dewatering related odor identified in the SHF Building office adjacent to BFP Area. Furnish and install new access hatch. Infill the existing access hatch opening. Modify SCADA to integrate the new BFP No. 3 associated equipment and subsystems control system. All associated demolition, civil, electrical, mechanical, controls, and other systems to provide complete operating system.
Posted Date
Dec 17, 2025
Due Date
Feb 10, 2026
Release: Dec 17, 2025
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Belt Filter Press No. 3 Installation, the Work, includes, but is not necessarily limited to: Addition of a 3rd BFP of equal capacity as the existing BFP Nos. 1 and 2. Addition of a 3rd dewatered cake pump for BFP No. 3. *Addition of a 3rd dewatered sludge cake piping to discharge to an existing storage silo or directly to a sludge hauling trailer. Addition of a 4th sludge feed pump and new piping to BFP No. 3. Modify existing polymer feed system to provide polymer feed for BFP No. 3. New HVAC design to accommodate BFP No. 3. Modify HVAC system to address dewatering related odor identified in the SHF Building office adjacent to BFP Area. Furnish and install new access hatch. Infill the existing access hatch opening. Modify SCADA to integrate the new BFP No. 3 associated equipment and subsystems control system. All associated demolition, civil, electrical, mechanical, controls, and other systems to provide complete operating system.
Available