BRUSH RUN WATER POLLUTION CONTROL PLANT MCC REPLACEMENT RFP
Posted
Nov 23, 2026
Jan 21, 2027
PETERS TOWNSHIP SANITARY AUTHORITY will receive sealed proposals online via PennBid for the BRUSH RUN WATER POLLUTION CONTROL PLANT MCC REPLACEMENT project, in accordance with the Contract Documents. Sealed bids may be submitted and updated online via the PennBid Program until 2:00 PM on Thursday, January 21, 2027. Bids will be opened thereafter at the Authority office, 111 Bell Drive, McMurray, PA, 15317. The Work includes all materials, labor, and equipment necessary for the replacement of the motor control center (MCC) and associated miscellaneous Work as shown on the drawings and as specified. The project site is located at the Authority’s Brush Run Water Pollution Control Plant, 111 West Valley Brook Road, McMurray, PA, 15317. All documents and solicitation details will be available at no cost at the PennBid website as of November 23, 2026. To access this solicitation, go to https://pennbid.bonfirehub.com and click on Bids on the left-hand side of the website. Search the “number” column for “Peters Township Sanitary Authority, Washington County - GHD”. The “title” of the project is “BRUSH RUN WATER POLLUTION CONTROL PLANT MCC REPLACEMENT”. Each Bid shall be accompanied by a Certified Check or Bid Bond payable to PETERS TOWNSHIP SANITARY AUTHORITY in an amount of not less than ten percent (10%) of the total bid in accordance with the provisions in the Instructions to Bidders. Each Bid must be complete, and the right is reserved to reject any and all Bids and to accept any Bid deemed to be most favorable to the interests of PETERS TOWNSHIP SANITARY AUTHORITY. A mandatory pre-bid meeting will be held at 2:00 PM on December 17, 2026, at the Brush Run Water Pollution Control Plant. Failure to attend the pre-bid meeting will result in disqualification.

