CD2212 CSA Emergency Power Improvements RFP
Aug 1, 2026
Closes
Aug 6, 2026
Emergency Power Improvements (CPS-2-8-11-12-13-17), the Work, includes, but is not necessarily limited to, the replacement of the existing emergency diesel generators located inside Central Pump Stations CPS-2, 8, 11, 12, 13, and 17 with new generators, include diesel fuel subbase tanks, to be located outside the pump station on a concrete pad. The Work also includes temporary bypass systems, the replacement of Automatic Transfer Switches at four (4) of the stations, one (1) transformer replacement, concrete steps, and new steel access steps with FRP grating and railings