School DistrictCA
Posted
Sep 30, 2026
Oct 21, 2026
Vista Continuation High School Modernization: Concrete Floor Finishing and Epoxy Flooring
work icudes sealing and polishing of all indicated concrete floors and resinous flooring.
Description: Work includes flooring & base material including resilient flooring, carpeting, and luxury vinyl plank flooring, including resilient base and all accessories.
SchoolDistrict · CA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
School DistrictCA
Posted
Sep 30, 2026
Oct 21, 2026
work icudes sealing and polishing of all indicated concrete floors and resinous flooring.
School DistrictCA
Posted
Sep 30, 2026
Oct 21, 2026
Work includes provide all primers, paint, coatings, putty’s, concrete sealer, fillers, grout, and accessories for application which include but are not limited to exposed building and site exterior items / surfaces and exposed interior items / surfaces.
School DistrictCA
Posted
Sep 30, 2026
Oct 21, 2026
Work includes all interior and exterior floor and wall tile, tile trim, cove base, mortar bed, waterproof membrane, crack isolation membrane, sealer, fasteners, shims, spacers and grout required to produce complete, ready for use tiled surface.
School DistrictCA
Posted
Sep 30, 2026
Oct 21, 2026
Work includes complete sanitary sewer system as noted in the contract documents, including grease, waste, and vent piping with final connection to line 5' outside building and connections to all fixtures, equipment, and appliances.
Decision makers connected to this RFP from Kern High School District.