Florida Department of Transportation
State AgencyFL
Posted
Sep 14, 2026
Oct 9, 2026
SR-736/Davie Blvd Bridge Over South Fork New River (860038) - Bridge Repair/Rehabilitation
Work includes 475 LB of reinforcing steel- bridge substructure; 3 LF of beam repair; 12,746 LB of structural steel-rehabilitation; Movable bridge machinery & casting-rehabilitation, recondition, other machinery components (44969115201, bridge no. 860038); 40 LF of pipe handrail-guiderail aluminum; 1,000 SF of coating existing structural steel; clearing and grubbing; 114 SY of 1 1/4" milling existing asphalt pavement; painted pavement markings;
