Mississippi Department of Transportation
State AgencyMS
Posted
Aug 29, 2026
Sep 22, 2026
Bridge Repair on SR 532 over Stream (Bridge No. 13.5) RFP
Work includes 3,479 SF permanent steel sheet piling, 113 Ton loose riprap, size 300, 55 SY geotextile under riprap, 3,000 pounds deep injection undersealing, bridge repair, installation of timber lagging, 84 SY removal of asphalt paved shoulders, all depths, 300 LF removal of guard rail, including rails, posts and terminal ends, 50 Ton granular material, crushed stone, 250 LF saw cut, full depth, 50 LF guard rail, class a, type 1, 4 EA guard rail, bridge end section, type h, 4 EA guard rail, terminal end section, additional construction signs. See attached file.