Closing soon

Bridge Repair on SR 532 over Stream (Bridge No. 13.5)

Description: Work includes 3,479 SF permanent steel sheet piling, 113 Ton loose riprap, size 300, 55 SY geotextile under riprap, 3,000 pounds deep injection undersealing, bridge repair, installation of timber lagging, 84 SY removal of asphalt paved shoulders, all depths, 300 LF removal of guard rail, including rails, posts and terminal ends, 50 Ton granular material, crushed stone, 250 LF saw cut, full depth, 50 LF guard rail, class a, type 1, 4 EA guard rail, bridge end section, type h, 4 EA guard rail, terminal end section, additional construction signs. See attached file.

Released
Aug 29, 2026
Closes
Sep 22, 2026(5 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts