Closing soon

Bridge Preservation on SR 25 over Plummer Slough (Bridge No. 12.7)

Description: Work includes 85 SY removal of bridge deck, 300 LF removal of bridge railing, 10 SY removal of part of end bent cap, curb, and wingwall, 1,720 CY channel excavation, fm, 150 ton granular material, size 57, 750 LF hp 14 x 89 steel piling, 159 LF 40' prestressed concrete beam, type i+2, 140 LF 70' prestressed concrete beam, type iii, 63,512 pounds reinforcement, 303 LF concrete railing, 36", 9,004 Ton loose riprap, size 300, 1,380 Ton loose riprap, size 500, 6,796 SY geotextile under riprap, 2 EA pda test pile, hp steel pile, 2 EA pile restrike, 28 CY bridge concrete, class aa, 71 CY bridge concrete, class bd, 235 CY box bridge concrete, class b. See attached file.

Released
Sep 2, 2024
Closes
Sep 22, 2026(5 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts