CityCA
Posted
Oct 26, 2026
Dec 1, 2026
FAX Administration Building Parking Lot Shade Structure *REBID* RFP
Furnish and install approx. 140 ft x 24 ft (3,360 SF) of a covered shade structure over the front parking stalls.
Description: Install of Pre-Engineered Cantilever Umbrella Shade Structure (20FT x20FT); Install of Pre-Engineered Multi Sail Cluster Shade Structure; Install Temporary Chain Link Fence 6' tall with Fabric Screen.
City · CA, US
From the first pre-RFP signals to the published RFP and its files.
Meeting agenda
113 days before RFP
The proposed FY 26-27 CIP budget includes shade structures and irrigation upgrades at Vin Scully Centennial Park.
Program and the Foothill Zone Consolidation Project. The proposed FY 26-27 Capital Improvement Projects (CIP) budget includes the addition of 36 new projects funded by a variety of sources, including the General Fund, totaling approximately $15 million in new spending. This includes a $577,000 transfer from the General Fund operating budget…
City Council of the City of La Habra Regular Meeting
Meeting agenda · Jun 1, 2026
RFP published
Proposals due (8 days left)
Decision makers connected to this RFP from City of La Habra.
Adjacent opportunities open for bidding right now.
CityCA
Posted
Oct 26, 2026
Dec 1, 2026
Furnish and install approx. 140 ft x 24 ft (3,360 SF) of a covered shade structure over the front parking stalls.
Coachella Valley Association Of Govts
Special DistrictCA
Posted
Nov 5, 2026
Dec 9, 2026
CVAG is procuring professional consulting services to design five shade structures, approximately 26 native shade trees, and associated site improvements at five existing CV Link rest-stop locations. Services include preliminary engineering, surveying, geotechnical analysis, civil/structural and landscape/irrigation/electrical design, permitting and agency coordination, preparation of plans, specifications and estimates (PS&E), and bidding and construction support. Deliverables will be provided at design milestones and must meet applicable laws, professional standards, and grant-related requirements tied to Proposition 4 funding administered by CVMC.
Massachusetts Department of Conservation and Recreation
State AgencyMA
Posted
Nov 22, 2026
Dec 17, 2026
The project consists of the installation of (2) fabric shade canopies adjacent to the lake park athletic field, (1) on the east side over existing spectator bleachers, and (1) on the south side with accessible paving and paths, site furnishings, and native canopy trees.
Eastside Union School District
School DistrictCA
Posted
Nov 7, 2026
Dec 9, 2026
Eastside Union School District is seeking bids to install one District‑purchased 40'x44' metal shade structure (Shade Structure #1) at Eastside Elementary School, including associated flatwork. The scope includes installation of District‑purchased playground equipment beneath the shade, furnishing and installing new rubberized buffering underlayment and artificial turf surfacing, and related site preparation and assessment. Work must be completed by 2027-02-19 and bidders must meet California prevailing wage, have a Class B (General Building) contractor license, DIR registration, and provide required bid security and performance/payment bonds.