Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of the removal and replacement of 4,660 total lineal feet (LF) of sidewalk and the installation of 740 LF of new sidewalk within the village of rawson. The sidewalk shall be 4 feet in width and constructed to a thickness of 4 inches (4").
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Main Street Sidewalk Improvement Project contract generally described as follows: Sidewalk improvements on Main Street between S Todd Street and S Broadway Street including, but not limited to pavement removals, roadway lighting, curb and gutter, sidewalk, traffic control, surface restoration, and other associated appurtenances as specified and indicated on the drawings.
Posted Date
Jan 12, 2026
Due Date
Jan 27, 2026
Release: Jan 12, 2026
Close: Jan 27, 2026
Main Street Sidewalk Improvement Project contract generally described as follows: Sidewalk improvements on Main Street between S Todd Street and S Broadway Street including, but not limited to pavement removals, roadway lighting, curb and gutter, sidewalk, traffic control, surface restoration, and other associated appurtenances as specified and indicated on the drawings.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of Westport seeks bids for the Compo Road South Sidewalk Improvement Project. The work generally includes construction and rehabilitation of sidewalks and related appurtenances along Compo Road South to improve pedestrian accommodations and ADA compliance. Bids are due to the Town of Westport by 11:00 AM on January 29, 2026.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
The Town of Westport seeks bids for the Compo Road South Sidewalk Improvement Project. The work generally includes construction and rehabilitation of sidewalks and related appurtenances along Compo Road South to improve pedestrian accommodations and ADA compliance. Bids are due to the Town of Westport by 11:00 AM on January 29, 2026.
AvailableProcurement for sidewalk and ADA improvement services at Deering Oaks Park, including demolition, new sidewalk installation, curb ramp reconstruction, curbing, drainage, and pavement markings.
Posted Date
-
Due Date
Feb 19, 2026
Close: Feb 19, 2026
Procurement for sidewalk and ADA improvement services at Deering Oaks Park, including demolition, new sidewalk installation, curb ramp reconstruction, curbing, drainage, and pavement markings.
AvailableWork includes traffic control including, but not limited to permits, signage, flaggers, and lane closures, demolish, remove, and dispose of concrete curbs and sidewalks and driveways, replace existing inlet, install bioretention, install detention swale, install new concrete curbs, sidewalks & driveways, install new ADA compliant ramps as protect existing trees, planting.
Posted Date
Jan 21, 2026
Due Date
Feb 11, 2026
Release: Jan 21, 2026
Close: Feb 11, 2026
Work includes traffic control including, but not limited to permits, signage, flaggers, and lane closures, demolish, remove, and dispose of concrete curbs and sidewalks and driveways, replace existing inlet, install bioretention, install detention swale, install new concrete curbs, sidewalks & driveways, install new ADA compliant ramps as protect existing trees, planting.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →