Summary
The proposed work consists of cold milling the existing asphalt surface and paving a variable depth HMA Surface Course, IL 9.5, Mix C, N50 (Fiber Modiied), along with removal and replacement of sidewalk curb ramps and traffic control
The project shall consist of saw cutting, cold milling and disposal of existing HMA surface course, placement of temporary ramps, overlay of existing pavement with variable depth HMA Surface Course (Fiber Modiied), removal and replacement of ADA sidewalk ramps and adjacent curb, and all traffic control. The length of the project is 1,134 LF and the nominal pavement width is 27 LF.