Summary
Contract work consists of a Hot Mix Asphalt Overlay of 0.75" HMA Level Binder and 1.5" HMA Surface Course, Aggregate Base Repair, Earth Excavation, and Topsoil Furnish and Place 4" (Special) at the following locations in the City of Byron: Chestnut Street from Blackhawk Drive (IL Route 2) to 5th Street. (1540 feet); Market Street from 2nd Street to 5th Street. (1168 feet); North Grant Street from Blackhawk Drive (IL Route 2) to 2nd Street (356 feet); All Saints Drive from Mineral Street to End of Road. (418 feet); South Walnut Street from Front Street to End of Road. (609 feet); West Diamond Street from South Walnut Street to Union Street (Illinois Route 72). (384 feet).