Special DistrictFL
Posted
Aug 10, 2026
Sep 10, 2026
Replacement of Generator No. 1 At the Navarre Wastewater Treatment Plant RFP
Replacement of generator no. 1 at the wastewater treatment plant.
Description: Work consists of the demolition and removal of an existing asbestos roof at the wastewater treatment plant (wwtp) control building. Additional work shall include all labor, materials, and equipment necessary to inspect the existing wood sheathing and replace any damaged or rotted wood sheathing, install a complete EPDM rubber roofing system, as well as preparing, restoring, and cleaning the project area in accordance with the plans and specifications and as directed by the Engineer and Village.
City · NY, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Special DistrictFL
Posted
Aug 10, 2026
Sep 10, 2026
Replacement of generator no. 1 at the wastewater treatment plant.
Harrison County Utility Authority
Special DistrictMS
Posted
Aug 9, 2026
Sep 10, 2026
The Harrison County Utility Authority is soliciting electronic bids for the North Gulfport Wastewater Treatment Plant Splitter Box Gate Replacement. The work includes removal and disposal of two existing sluice gates, installation of two Owner-furnished stainless-steel sluice gates, removal of settled grit and solids, transport of the new gates, and an influent bypass plan for flows ranging from 2 to 10 MGD to the secondary clarifiers. The notice is a contractor bid solicitation rather than a grant program; bids are due by 10:00 a.m. CDT on Thursday, September 10, 2026, and will be publicly read immediately afterward at the Authority's Gulfport board room.
CityWA
Posted
-
Sep 16, 2026
The City of Harrington is soliciting sealed bids for upgrades to its wastewater treatment plant. The work includes installing a new micro strainer, modifying the return weir, and providing the labor, equipment, transportation, supervision, materials, and incidentals needed to complete the improvements. The estimated project cost is $1,000,000 - $1,200,000, and the project is partially funded through the Washington State Community Development Block Grant program with federal funds from the U.S. Department of Housing and Urban Development.
CityNC
Posted
Aug 27, 2026
Sep 28, 2026
Work includes rehabilitation and replacement of multiple items at the wastewater treatment plant (wwtp), replacement of the grit removal system, one (1) influent pump, one (1) vfd, and modifications to the associated electrical.
Decision makers connected to this RFP from Village of Buchanan.