Summary
Work includes construction of a new bridge over the little river, removal and salvaging of the existing bridge, road and utility realignment, habitat and slope restoration, and removal of existing walls and abutments. Project consists of the demolition of the existing bridge and abutments; the construction of a new replacement bridge in a new location; slope repair and entry road realignment. Installation of drilled piles and cast-in-place concrete abutments; installation of pre-fabricated weathered steel girder bridge; realignment of road approach to new bridge location; installation of approach guardrail; rerouting of utilities; slope repair at site of existing bridge and at areas of slope failure; remove the existing bridge and abutments after installing new bridge. See attached file.