Work includes bridge construction access, bonds and insurance, construction stakes, lines and grades, cpm progress schedule, clearing and grubbing within right of way, removal and disposal of existing asphalt pavement 191.000 SY, removal of exist guardrail 205.000 LF, removal and disposal of existing bridge, unclassified excavation 2,392.000 CY, borrow excavation 1,568.000 CY, geogrid reinforcement (uniaxial) 1,256.000 SY, fine grading 733.000 SY, maintenance stone 100.000 Ton, liquid asphalt binder pg64-22 26.000 Ton, milling existing asphalt pavement (variable) 1,140.000 SY, asphalt base course - type b 102.000 Ton, asphalt intermediate course type c 120.000 Ton, asphalt surface course type c 232.000 Ton. See attached file.
Available