Summary
The existing bridge is a 3'-wide pedestrian bridge crossing an intermittent stream channel. Replace the existing structure with approx., 18 LF of dual 55" by 73" aluminized steel storm culverts complete with wing walls and a multiple end section. A new 5'-wide walking trail will be constructed over the culverts to improve pedestrian access and safety. Project work includes the installation of approximately 115 square yards of riprap, 18 SY of 1-1/4" crushed aggregate base course (CABC), 26 SY of screenings, and 410 SY of site restoration. Additional work includes approx., 20 CY of common excavation, construction staking, and site clearing necessary to complete the improvements.