Description: The project generally consists of installing a new 12-inch water main with associated valves, fittings, and fire hydrants, along with storm drainage improvements. Work also includes asphalt and fencing removal, excavation and backfill, and traffic and erosion control. Affected areas will be restored with asphalt, concrete, curb and gutter, landscaping, riprap, and signage.
City · WY, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from City of Cheyenne.
Adjacent opportunities open for bidding right now.
CityMO
Posted
Sep 8, 2026
Oct 13, 2026
The Work of this Contract consists of the following: 1. Wastewater Treatment Facility Upgrades - Construction and installation of a mechanical influent screen and the replacement of oxidation ditch rotors 2. Collection System Rehabilitation & Upgrades - Collection System: Rehabilitation of the existing sewer system includes point repairs, lining or replacement of manholes and gravity sewers, as well as other miscellaneous repairs - Terminal Lift Station: Installation of a level sensing probe to replace the existing float pump controls, replacement of the cell monitoring system and raising all electric components out of the floodplain.
CityKS
Posted
Aug 14, 2026
Sep 29, 2026
Project will consist of mobilization 1 LS 54" concrete stormsewer (rcp) 754 LF concrete pavement (10" plain) (ae) (remove and replace) 763 SY curb and gutter (2'-6" combined) (ae) (remove and replace) 167 LF handicap ramp (remove and replace) 14.2 SY decorative brick inlay (remove and replace) 33 SY decorative retaining wall (remove and replace) 65 LF flowable fill 100 CY 8'x6' manhole - 9th ave location 1 ea 8'x10' manhole - 8th ave location 1 EA waterline (6") (c-900) (in place) 40 LF waterline (10") (c-900) (in place) 90 LF 6"x45 degree bend 4 EA 10"x45 degree bend 1 EA 6" gate valve with valve box 3 EA 10" gate valve with valve box 1 EA 10"x6" cross 1 EA 10"x10" cross 1 EA connection to existing storm sewer (12") 1 EA connection to existing storm sewer (15") 1 EA.
CityNC
Posted
Sep 8, 2026
Oct 8, 2026
Work includes 26 TON abc stone (additional as needed); 14 TON asphalt surface course - type 9. 5b; 13 TON asphalt binder for plant mix - grade pg64-22; 111 SY asphalt removal (0" to 12" below existing pavement); 15,680 SY seeding and mulching; 8,110 LF concrete curb and gutter (variable); 8,110 L remove concrete curb and gutter; 3,003 SY concrete sidewalk (4") (includes 6" abc stone); 3,003 SY concrete sidewalks, driveways, and aprons (6") (includes 6" abc stone); 80 SY brick (herringbone); 254 ton single curb ramps (includes truncated domes). See attached file.
CityMA
Posted
Sep 16, 2026
Oct 2, 2026
The City of Pittsfield is soliciting bids for street improvements at the Hubbard Avenue Underpass, with an estimated cost of $2,000,000.00. Bid documents became available on September 16, 2026, and the bid opening is scheduled for October 2, 2026, at 2:00 PM; no pre-bid meeting is scheduled. The official posting lists a $20.00 nonrefundable mailing fee and no sub-bid deadline.