CityWI
Posted
-
Jan 28, 2027
Sauk Creek Greenway Phase 3
Sauk creek greenway phase 3.
Description: Scope of work of the contract includes the televising of sanitary sewer and storm sewer.
SpecialDistrict · TX, US
Original attachments and procurement documents tied to this bid.
These related opportunities are still open for bidding.
CityWI
Posted
-
Jan 28, 2027
Sauk creek greenway phase 3.
CityWY
Posted
Aug 25, 2026
Sep 29, 2026
Project consists of water tank replacement and installation and various work associated with the tanks that serve the water system and treatment facility.
CityOH
Posted
-
Nov 18, 2026
Provide a wastewater infrastructure involving construction of approximately 10,926 LF of 48-inch sanitary sewer reinforced concrete jacking pipe is provided with an internal cast-in-place hdpe stud liner for corrosion protection. The project also includes approximately 63 LF of 18- inch, 82 LF of 8-inch, and 70 LF of 12-inch sanitary sewer installed by open cut and installation of twelve (12) manholes. Construction also includes four (4) jacking pits, five (5) receiving pits, and eight (8) microtunnel drives. The project will include bypass pumping and abandonment of the existing 24-inch sugar run subtrunk, dewatering.
CitySC
Posted
-
Sep 24, 2026
Work includes storm drainage, grading roadways, tar and chip, curb and gutter.