Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide utility tunnel sump pump system. 3.5 hp submersible pumps; 3 phase 60 hz 460-volt 1760 rpm; 3" discharge flanges with gaskets and bolts; cast iron impeller; stainless steel shaft; silicon carbide / ceramic mechanical seal on pump side; ceramic / graphite mechanical seal on motor side; klaxon bimetallic thermal protection; 33 ft power cable.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Dallas-Fort Worth International Airport Board (Airport Board) is soliciting quotes via an electronic RFQ for a Utility Tunnel Sump Pump System with specific technical specifications. Submissions must be made through the Airport’s Bonfire portal and will not be accepted by mail or email; delivery is F.O.B. DFW International Airport (Central Warehouse at 3122 East 30th Street). The opportunity is open and scheduled to close on 2026-01-07 at 14:00 CST (2:00 PM), with questions due prior to that date.
Posted Date
Dec 31, 2025
Due Date
Jan 7, 2026
Release: Dec 31, 2025
Close: Jan 7, 2026
The Dallas-Fort Worth International Airport Board (Airport Board) is soliciting quotes via an electronic RFQ for a Utility Tunnel Sump Pump System with specific technical specifications. Submissions must be made through the Airport’s Bonfire portal and will not be accepted by mail or email; delivery is F.O.B. DFW International Airport (Central Warehouse at 3122 East 30th Street). The opportunity is open and scheduled to close on 2026-01-07 at 14:00 CST (2:00 PM), with questions due prior to that date.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This is an open Request for Quotation titled "RFQ 17-74 REBID Vehicle Exhaust Removal System" posted for the City of Somerville on the Massachusetts CommBuys portal for procurement of vehicle exhaust removal equipment. The posting lists an Available Date of 2017-07-19 and a Bid Opening Date of 2047-08-02, is marked OPEN, and no primary PDF/DOC/PPT attachment was found on the scraped posting.
Posted Date
Jul 19, 2017
Due Date
Aug 2, 2047
Release: Jul 19, 2017
Close: Aug 2, 2047
This is an open Request for Quotation titled "RFQ 17-74 REBID Vehicle Exhaust Removal System" posted for the City of Somerville on the Massachusetts CommBuys portal for procurement of vehicle exhaust removal equipment. The posting lists an Available Date of 2017-07-19 and a Bid Opening Date of 2047-08-02, is marked OPEN, and no primary PDF/DOC/PPT attachment was found on the scraped posting.
AvailableThe removal, replacement, and installation of complete sewage sump pump systems. Install complete sewage sump pump systems: City Hall Sub-Basement needs to replace the faulty sewage sump pump bearing, discharge piping inside the pit, a full-port gate, check valves, and upgrade the controls. EOC Sub-Basement requires the replacement of the discharge piping inside the pit, upgrading of the controls, a full-port gate, and check valves. Police Station requires the replacement of two (2) sump pump systems, a full-port gate, check valves, upgrading of controls, and a new 208/230 volt 20 amp circuit.
Posted Date
Dec 11, 2025
Due Date
Jan 14, 2026
Release: Dec 11, 2025
Close: Jan 14, 2026
The removal, replacement, and installation of complete sewage sump pump systems. Install complete sewage sump pump systems: City Hall Sub-Basement needs to replace the faulty sewage sump pump bearing, discharge piping inside the pit, a full-port gate, check valves, and upgrade the controls. EOC Sub-Basement requires the replacement of the discharge piping inside the pit, upgrading of the controls, a full-port gate, and check valves. Police Station requires the replacement of two (2) sump pump systems, a full-port gate, check valves, upgrading of controls, and a new 208/230 volt 20 amp circuit.
AvailableApprox 4550 LF 4" sump pump collector; 4550 LF 4" boring; 4550 LF tracer wire; etc. See attached file.
Posted Date
Dec 19, 2025
Due Date
Jan 8, 2026
Release: Dec 19, 2025
Close: Jan 8, 2026
Approx 4550 LF 4" sump pump collector; 4550 LF 4" boring; 4550 LF tracer wire; etc. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →