CountyCA
Posted
Aug 31, 2026
Sep 24, 2026
Kiefer Landfill Basin Discharge Piping
Furnish & install buried 12" schedule 40 pvc pipe, and connect to existing network, including excavation, and backfill - 1 ls, furnish and install 8 hdpe sdr 17 pipes - 1132 lf, furnish and install 6 hdpe sdr 17 pipes, valves and fittings - 1 ls, furnish and install 2" air relief valve at sta 7+08 - 1 ls, excavate, trench and backfill, selective demolition and repair access road 1 ls, furnish and install 10" corrugated metal pipe at 2 crossings (0+46 and 11+00). 1 ls.