Posted
Oct 1, 2026
Oct 16, 2026
USNS WALLY SCHIRRA (T-AKE 8) FY27 MID-TERM AVAILABILITY (MTA)
The U.S. Navy is seeking a qualified ship-repair contractor to perform the FY27 Mid-Term Availability on the USNS Wally Schirra (T-AKE 8) under a firm-fixed-price, standalone contract. The work covers planning, engineering, procurement, prefabrication, shipyard production, testing, and quality assurance for repair and maintenance items, outside the contiguous United States within the U.S. 7th Fleet Area of Responsibility (excluding India). Proposals will be evaluated for best value, including technical capability, past performance, and price, and must be submitted electronically by the stated deadline.
