Closing soon

USBR Patillas Dam Seismic Retrofit Design Update and Industry Outreach

Description: Construction of a zoned earthfill berm (~600,000 cubic yards) to enhance seismic stability. Commercially sourced materials from nearby quarries for engineered zones. Engineered drainage systems including sand/gravel filters and a 24" hdpe toe drain. Key trench excavation (~35 ft) with foundation dewatering. Installation of advanced instrumentation (in-place inclinometers, piezometers, pressure transducers, settlement points). Demolition and reconstruction of reinforced concrete downstream discharge facilities, canal overflow, forebays, and former power building. Installation of a new 54-inch concrete-encased steel conduit with a 36-inch bifurcation. Outlet works reconstruction inside 20-foot-wide existing horseshoe tunnel (~330 F long) and backfill with clsm. Outlet works extension of approx. 200 F, which also requires diver-installed temporary bulkheads through a 24-inch by 24-inch square manhole at 90+ ft depth. Construction of two new concrete control buildings for gates and valves.

Released
May 20, 2026
Closes
Aug 8, 2026(10 days left)

Files

Original attachments and procurement documents tied to this bid.

Federal RFP files are for Starbridge customers only.

You can request RFP files from all other buyer types for free on this site.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts