US-40; 189 to Mill Road

Description: Work consists of widen existing facility, includes 6,326 CY of Granular Borrow; 18,978 SY of Separation Geotextile; 1,303 ft of Excavate and Expose; Install Transformer Base; 90 SY of Remove Concrete Sidewalk; 157 SY of Remove Concrete Driveway; 7,732 SY of Remove Asphalt Pavement; 10 CY of Abandon Pipe; 7,621 CY of Roadway Excavation; 4,765 CY of Roadway Excavation; 32,359 SF of Concrete Sidewalk; 15,358 TON of HMHMA - 1/2"; 194 TON of Asphalt Mix - 1/2"; 32,359 SF of Concrete Sidewalk.

Buyer
Released
Sep 26, 2026
Closes
Oct 20, 2026(11 days left)