Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
WSDOT is soliciting bids for a Public Works contract to construct two elevated structures and associated infrastructure on the North Spokane Corridor between Alki Avenue and Mission Avenue, including a partial interchange at Trent Avenue/SR 290. The work includes bridges, a truss system for a shared-use structure, utility improvements, paving, drainage, signing, traffic control, and continuation of the Children of the Sun Trail. A pre‑bid conference is scheduled, and bids will be opened after 11:00 a.m. on bid day.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
WOrk consists of Construction of 8" and 12" diameter water main within and along HWY 395 including trenching and trench repair.
Posted Date
Jan 4, 2026
Due Date
Feb 12, 2026
Release: Jan 4, 2026
Close: Feb 12, 2026
WOrk consists of Construction of 8" and 12" diameter water main within and along HWY 395 including trenching and trench repair.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide high school, cafeteria building addition for ADA restroom and alterations to stage area.
Posted Date
Jan 6, 2026
Due Date
Feb 4, 2026
Release: Jan 6, 2026
Close: Feb 4, 2026
Provide high school, cafeteria building addition for ADA restroom and alterations to stage area.
Available160 EA Stage Vanner D016216-1 HV Power Stage. This solicitation is for a one-year blanket contract.
Posted Date
Dec 18, 2025
Due Date
Jan 29, 2026
Release: Dec 18, 2025
Close: Jan 29, 2026
160 EA Stage Vanner D016216-1 HV Power Stage. This solicitation is for a one-year blanket contract.
Available200 EA Motor Sprague devices E-008-091 wiper, (New flyer part # 225892).
Posted Date
Jan 20, 2026
Due Date
Jan 29, 2026
Release: Jan 20, 2026
Close: Jan 29, 2026
200 EA Motor Sprague devices E-008-091 wiper, (New flyer part # 225892).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →