Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Kentucky Transportation Cabinet is soliciting contractors to perform bridge repairs on US 31E over River Road in Jefferson County, KY, including girder strengthening, saddle bearing repairs, rivet and bolt replacement, surface preparation, installation of plates/angles/fasteners and painting, with required traffic control and compliance with Kentucky standard specifications. The project is part of a federally funded program with required completion by September 30, 2026 and specific milestones (girder strengthening to be completed by May 31, 2026). The solicitation was posted January 8, 2026 and bids are due January 29, 2026; plan sheets and bidding documents are available through the Kentucky bidding portal (Bid Express) linked at the buyer site.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for bridge repairs, including girder strengthening, saddle bearing repairs, sidewalk floorbeam connection repair, painting structural steel repairs, bridge joint replacement, and bridge joint seal replacement.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
This RFP is for bridge repairs, including girder strengthening, saddle bearing repairs, sidewalk floorbeam connection repair, painting structural steel repairs, bridge joint replacement, and bridge joint seal replacement.
AvailableThe Town of Wallingford is soliciting qualifications from firms to provide construction inspection services for the rehabilitation of Bridge #04392 on Toelles Road over the Quinnipiac River. The selected firm will perform on-site inspections during rehabilitation, ensure compliance with project specifications, document progress, and coordinate with contractors and stakeholders. The solicitation (RFQ 25-071) is a public procurement with a submission deadline of 2026-02-11 and is not a grant program.
Posted Date
Jan 20, 2026
Due Date
Feb 11, 2026
Release: Jan 20, 2026
Close: Feb 11, 2026
The Town of Wallingford is soliciting qualifications from firms to provide construction inspection services for the rehabilitation of Bridge #04392 on Toelles Road over the Quinnipiac River. The selected firm will perform on-site inspections during rehabilitation, ensure compliance with project specifications, document progress, and coordinate with contractors and stakeholders. The solicitation (RFQ 25-071) is a public procurement with a submission deadline of 2026-02-11 and is not a grant program.
The City of Redding, California is soliciting proposals for construction management services for the Westside Road Bridge Over Canyon Hollow Creek Replacement Project.
Posted Date
Jan 14, 2026
Due Date
Feb 13, 2026
Release: Jan 14, 2026
Close: Feb 13, 2026
The City of Redding, California is soliciting proposals for construction management services for the Westside Road Bridge Over Canyon Hollow Creek Replacement Project.
AvailableConstruction of bridge. The proposed construction will include removing and replacing the bridge, road work, levee work, trail work and other related work.
Posted Date
Dec 12, 2025
Due Date
Jan 21, 2026
Release: Dec 12, 2025
Close: Jan 21, 2026
Construction of bridge. The proposed construction will include removing and replacing the bridge, road work, levee work, trail work and other related work.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis