Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for bridge repairs, including girder strengthening, saddle bearing repairs, sidewalk floorbeam connection repair, painting structural steel repairs, bridge joint replacement, and bridge joint seal replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Request for proposals for the replacement of the US 60 EB bridge over Clear Creek in Shelby County.
Posted Date
Jan 29, 2026
Due Date
Jan 29, 2026
Release: Jan 29, 2026
Close: Jan 29, 2026
Request for proposals for the replacement of the US 60 EB bridge over Clear Creek in Shelby County.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Jan 8, 2026
Close: Jan 29, 2026
Bridge Repairs.
AvailableRehabilitation of Bridge No 307 - Gravel Pit Road Over East Fork Whitewater River.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
Rehabilitation of Bridge No 307 - Gravel Pit Road Over East Fork Whitewater River.
AvailableWork consists of the replacement of the existing bridge and addressing an existing slope failure. During construction of the bridge, traffic will be maintained using temporary approaches and a temporary bridge structure to the east of the existing bridge and near the slope failure area.
Posted Date
Dec 8, 2025
Due Date
Jan 15, 2026
Release: Dec 8, 2025
Close: Jan 15, 2026
Work consists of the replacement of the existing bridge and addressing an existing slope failure. During construction of the bridge, traffic will be maintained using temporary approaches and a temporary bridge structure to the east of the existing bridge and near the slope failure area.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →