Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the removal and replacement of the existing HVAC system and duct work, patching and repairing of existing roofing, patch and repair of existing curb flashing and cap flashing; installation of new HVAC units and its anchorage on rooftop; installation of new HVAC units and concrete curbs at ground level; demolition of existing asphalt and installation of new asphalt; installation of new chain-link fencing and gates; install new duct for HVAC units and disconnects; electrical work as indicated; provide a balancing of the new system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement for the installation of HVAC systems in the Gymnasium.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
Procurement for the installation of HVAC systems in the Gymnasium.
AvailableDouglas Unified School District, #27 solicits sealed bids to upgrade HVAC systems at Douglas High School; the work includes removal of existing HVAC equipment, installation of new systems per engineering drawings, and compliance with local building codes. The project is funded by the Division of School Facilities and requires a mandatory pre-bid site visit on January 14, 2026; questions are due January 20, 2026. Electronic sealed bids are due January 28, 2026 at 2:00pm America/Phoenix and will be publicly opened virtually immediately after the deadline.
Posted Date
Jan 4, 2026
Due Date
Jan 28, 2026
Release: Jan 4, 2026
Close: Jan 28, 2026
Douglas Unified School District, #27 solicits sealed bids to upgrade HVAC systems at Douglas High School; the work includes removal of existing HVAC equipment, installation of new systems per engineering drawings, and compliance with local building codes. The project is funded by the Division of School Facilities and requires a mandatory pre-bid site visit on January 14, 2026; questions are due January 20, 2026. Electronic sealed bids are due January 28, 2026 at 2:00pm America/Phoenix and will be publicly opened virtually immediately after the deadline.
The Rapides Parish School Board is soliciting sealed bids for installation of new synthetic turf and resurfacing the track at Pineville High School Football facility (RPSB Bid #52-26-03). Bids must be received by 2:00 P.M. Central Time on Tuesday, January 27, 2026. Bidding documents can be obtained from Yeager, Watson & Associates, LLC or accessed electronically via CentralAuctionHouse.com.
Posted Date
Dec 18, 2025
Due Date
Jan 27, 2026
Release: Dec 18, 2025
Close: Jan 27, 2026
The Rapides Parish School Board is soliciting sealed bids for installation of new synthetic turf and resurfacing the track at Pineville High School Football facility (RPSB Bid #52-26-03). Bids must be received by 2:00 P.M. Central Time on Tuesday, January 27, 2026. Bidding documents can be obtained from Yeager, Watson & Associates, LLC or accessed electronically via CentralAuctionHouse.com.
Helix School District is requesting proposals from Construction Manager/General Contractor (CM/GC) firms for the Helix School Main Gymnasium Seismic Rehabilitation Project. Proposals are due by 5:00 PM local time on January 22, 2026, with a mandatory pre‑proposal conference scheduled for January 6, 2026 at noon at 106 Main Street, Helix, OR 97835. The scope consists of seismic strengthening of the main gymnasium; full RFP documents are provided by the district upon request via email per the notice.
Posted Date
-
Due Date
Jan 23, 2026
Close: Jan 23, 2026
Helix School District is requesting proposals from Construction Manager/General Contractor (CM/GC) firms for the Helix School Main Gymnasium Seismic Rehabilitation Project. Proposals are due by 5:00 PM local time on January 22, 2026, with a mandatory pre‑proposal conference scheduled for January 6, 2026 at noon at 106 Main Street, Helix, OR 97835. The scope consists of seismic strengthening of the main gymnasium; full RFP documents are provided by the district upon request via email per the notice.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis