City of Sturgeon
Project generally consists of, but is not limited to providing all labor, equipment, materials, supplies, tools and supervision necessary to replace lift station pumps, controls, and other appurtenances as necessary, perform minor plumbing/piping revisions to the existing force main just outside the valve chamber, and coordinate with electric utility to upgrade the existing single phase electric service to 3-phase.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Waycross
Wastewater Treatment Facility Upgrades β Phase 2 is described briefly as follows: In general, construction shall consist of conversion of sludge digester #2 to an aerobic digester. Removal of the digester roof, complete clean out, and installation of new mixing and aeration equipment along with slabs, piping, electrical, and controls for a working aerobic digester. Additional plant work shall include a new stairwell, plant by-pass pumping connection, and rehabilitation of the primary clarifier influent lines.
Posted Date
Sep 26, 2025
Due Date
Dec 5, 2025
Release: Sep 26, 2025
City of Waycross
Close: Dec 5, 2025
Wastewater Treatment Facility Upgrades β Phase 2 is described briefly as follows: In general, construction shall consist of conversion of sludge digester #2 to an aerobic digester. Removal of the digester roof, complete clean out, and installation of new mixing and aeration equipment along with slabs, piping, electrical, and controls for a working aerobic digester. Additional plant work shall include a new stairwell, plant by-pass pumping connection, and rehabilitation of the primary clarifier influent lines.
AvailableLangham Creek Utility District
The work consists of providing the necessary labor, materials, equipment, supervision, and plant for the construction of the wastewater treatment plant improvements, onsite lift station improvements, and liquid chemical conversion including but not limited to: lift station pump replacement and structural modifications; main process basins piping improvements; liquid chemical feed equipment, piping, CMU building with metal canopy chemical storage area; electrical; controls; demolition items; pavement; site grading and drainage; and site restoration as specified.
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2025
Release: Nov 14, 2025
Langham Creek Utility District
Close: Dec 17, 2025
The work consists of providing the necessary labor, materials, equipment, supervision, and plant for the construction of the wastewater treatment plant improvements, onsite lift station improvements, and liquid chemical conversion including but not limited to: lift station pump replacement and structural modifications; main process basins piping improvements; liquid chemical feed equipment, piping, CMU building with metal canopy chemical storage area; electrical; controls; demolition items; pavement; site grading and drainage; and site restoration as specified.
AvailableTown of Pelahatchie
Wastewater treatment facility improvements
Posted Date
Sep 25, 2025
Due Date
Nov 20, 2025
Release: Sep 25, 2025
Town of Pelahatchie
Close: Nov 20, 2025
Wastewater treatment facility improvements
AvailableCity of Newberry
Wastewater treatment facility (WWTF) expansion.
Posted Date
Oct 23, 2025
Due Date
Dec 18, 2025
Release: Oct 23, 2025
City of Newberry
Close: Dec 18, 2025
Wastewater treatment facility (WWTF) expansion.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis