Retrieving RFP details
Release
Close
Town of Pelahatchie
Wastewater treatment facility improvements
City of Comer
Modifications to the existing aeration system including removal of the floating aerator in the aeration pond and installation of a diffused aeration system in the aeration pond and aerated lagoon, and modifications to the existing 8" transfer pipe, piers, and splash pad in the aerated lagoon (including blowers and relevant electrical work). The work also includes demolition, earthwork, site work, yard piping, erosion and sediment control measures, grassing, construction staking, mobilization/demobilization, bonds, insurance, delivery of materials, take offs and all other appurtenances required for completion of the work as shown and as specified.
San Jacinto River Authority
Provide construct improvements to the existing grit classifier and associated systems, including, but not limited to mobilization, bonds and insurance, permits; existing grit slurry pump station modifications; new grit washing facility; protective coatings; yard piping; site drainage improvements; concrete pavement; electrical; controls; demolition items as specified; site restoration; including all incidental components for a complete and operation system.
City of Parlier
Work consist of replacement of an existing aerated lagoon wastewater treatment plant and a new extended aeration treatment facility.
Release
Sep 25, 2025
Close
Nov 04, 2025