Open RFP

Upgrade of Main Sewage Pump and Power Distribution Systems RFP

Description: Requirements and operational optimization by upgrading and replacing its main sewage pump (MSP) and power distribution systems, both of which have reached the end of their useful life. The Project shall also provide odor control to specific areas to reduce potential complaints. The major elements of work are as follows: Replacement and upgrade of the MSP System: five West Drywell MSPs in service; the 48" force main header for the existing MSPs, that discharges into the WRRF’s four primary sedimentation tanks (PST); six submersible pumps in service; the 42" force main header for the submersible pumps that discharges into the PSTs; permanent demolition of two out-of-service East Drywell MSPs; upgrades to the drywell MSP and ancillary support systems, including leveling metering; flow metering equipment, remote monitoring and control for the new MSP system; power sub-metering of the MSPs; related ancillary systems, including motor control centers (MCC), lighting panels and systems, and heating, ventilation, and air-conditioning (HVAC). Replacement and upgrade of the power distribution system: standby generator system; main incoming feeders; main power distribution systems, including replacement of the 5 kilovolt (kV) and 13.2 kV substation and switchgear (SWGR) systems; 12 MCCs; HVAC and lightning systems; temporary interim systems; related ancillary systems; interconnection and excess distribution costs coordination with the Long Island Power Energy and Gas (LIPSEG), the local power distribution utility, to accommodate the Project.

Buyer
NYCDEP

SpecialDistrict · NY, US

Released
Nov 9, 2026
Closes
Dec 18, 2026(31 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts