252-Network Contract Office 12 (36C252)
Provide upgrade facility generator controls construction. This project includes upgrading the control system for three (3) Cummins 1250kW diesel powered generators. This entails installing modernized PCC3.3 Controllers at each generator, replacing the legacy Digital Master Controller (DMC) with Cummins modern DMC 8000, and installing new control wiring to the MV switchgear. A temporary 480V generator (1000kW minimum) and 480V/13.8kV step up transformer will be needed to maintain backup power availability to the Facility. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Missouri Office of Administration
The project consists of upgrading the existing diesel-engine-driven generator control system and transfer switch at the Power Plant including the associated supporting equipment and building modifications.
Posted Date
Oct 10, 2025
Due Date
Dec 4, 2025
Release: Oct 10, 2025
Missouri Office of Administration
Close: Dec 4, 2025
The project consists of upgrading the existing diesel-engine-driven generator control system and transfer switch at the Power Plant including the associated supporting equipment and building modifications.
Available631-Leeds (00631)
Replace boilers & upgrade controls. For this requirement, the general contractor will be required to include general construction, demolition, modification, and renovation of the existing central boiler plant (building 8)
Posted Date
Oct 28, 2025
Due Date
Jan 21, 2026
Release: Oct 28, 2025
631-Leeds (00631)
Close: Jan 21, 2026
Replace boilers & upgrade controls. For this requirement, the general contractor will be required to include general construction, demolition, modification, and renovation of the existing central boiler plant (building 8)
AvailableRPO EAST (36C24E)
Chiller capacity and controls upgrade.
Posted Date
Nov 13, 2025
Due Date
Dec 30, 2025
Release: Nov 13, 2025
RPO EAST (36C24E)
Close: Dec 30, 2025
Chiller capacity and controls upgrade.
AvailableCalifornia Department of Water Resources
The California Department of Water Resources seeks bids to construct a CMU enclosure for a new 150 kW stationary engine generator and to relocate/replace existing switchgear and a unit substation at the Oroville Dam Flood Control Outlet. The project also includes moving electrical and communications equipment and adding a portable generator connection at the spillway deck to improve operational resilience and safety.
Posted Date
Nov 8, 2025
Due Date
Dec 10, 2025
Release: Nov 8, 2025
California Department of Water Resources
Close: Dec 10, 2025
The California Department of Water Resources seeks bids to construct a CMU enclosure for a new 150 kW stationary engine generator and to relocate/replace existing switchgear and a unit substation at the Oroville Dam Flood Control Outlet. The project also includes moving electrical and communications equipment and adding a portable generator connection at the spillway deck to improve operational resilience and safety.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis